Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 11 Mar 2026 |
| Application filed | 21 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sunil Kumar |
| Land area | 3.1 acres (1.2 ha) |
| Project cost | ₹8 lakh |
| Village / locality | Garihara |
| Taluk / tehsil | Masaurhi |
| District | Patna |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01642 |
In context
180 applications in Patna since January 2022 are in the same category (Mining): 161 approved, 18 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 1 months from filing to approval. At 3.1 acres, this one is smaller than 84% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Garihara, Masaurhi, Patna, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Prakash Chandra Medical College & Hospital Building Project — environmental approval granted, 4 km away
- Brick Earth Mining Project of M/s Huch Bricks at Mauza- Shahar Rampur, Anchal-… — environmental approval granted, 6.6 km away
- Proposed Brick Earth Mining Project of M/s Bhagwati Int Udyog, at Mauza -… — environmental approval granted, 7 km away
- Flyover span (5x25.00m + 3x335.00m + 15x25.00m + 3x20.00m + 4x25.00m) over… — more information requested, 7.4 km away
- Proposed Brick Earth Mining Project at Mauza- Khaira, Block- Naubatpur,… — environmental approval granted, 7.8 km away
- Brick Earth Mining for M/S R B M Bricks- Karwa Soil Brick Mining Project — environmental approval granted, 8.9 km away
- Proposed Brick Earth Mining Project for M/s Devi Maa Bricks at Mauza-… — environmental approval granted, 8.9 km away
- Proposed Brick Earth Mining Project of M/s G Sai Bricks at Mauza - Pali, PO,… — environmental approval granted, 9.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.