Project details
| Official title | Proposed Brick Earth Mining Project for M/s Rana Int Udyog at Village- Jorja, P.O- Sirua, P.S- Baheri, Block- Baheri, District- Darbhanga, State- Bihar. |
|---|---|
| Status | Environmental approval granted |
| Status since | 9 Sept 2026 |
| Application filed | 5 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Rana Nil Kamal Singh |
| Land area | 2 acres (0.8 ha) |
| Project cost | ₹34 lakh |
| Village / locality | Jurja |
| Taluk / tehsil | Baheri |
| District | Darbhanga |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01654 |
In context
92 applications in Darbhanga since January 2022 are in the same category (Mining): 61 approved, 29 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 37 days from filing to approval. At 2 acres, this one is smaller than 99% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Jurja, Baheri, Darbhanga, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Brick Earth Mining Project for M/s M.R.K.H Int Udyog at Mauza-… — environmental approval granted, 4 km away
- Brick Earth Mining project of M/s Jagdamba Enterprises at Mauza- Habidih,… — environmental approval granted, 6.5 km away
- Proposed Brick Earth Mining Project for M/s Sevak Int Udyog at Mauza- Balia,… — environmental approval granted, 6.7 km away
- Brick Earth mining project of M/s R.V.I. Int Udyog at Mauza- Balia, Block-… — environmental approval granted, 7 km away
- Proposed Brick Earth Mining Project for M/s Sanjay Int Udyog at Mauza-… — environmental approval granted, 7.2 km away
- (1+1)x2 = 4 Lane Staggered Toll Plaza in Varuna Bridge-Rasiyari Road (SH-88)… — more information requested, 9 km away
- Brick Earth Mining project of M/s Niraj Int Udyog at Mauza- Baheri, Block-… — environmental approval granted, 9 km away
- Brick Earth Mining for M/S Ragi Ent Udyog- Habidih Soil Brick Mining Project… — environmental approval granted, 9.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.