Quick answers
What is this project?
Proposed "Brick Earth Excavation Project" for M/s New Baba Bricks Industries at Mauja- Aurahi, Halka- Aurahi Ekparha, P.O.- Aurahi, P.S.- Gamhariya, Thana No.- 06, Anchal- Gamhariya, District- Madhepura (Bihar) is a proposed mining project in Aurahi, Gamharia, Madhepura, Bihar. The site covers 3.3 acres.
Who is building it?
The applicant is Shashi Kumar.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Aurahi, Gamharia, Madhepura, Bihar.
How big is it?
It has a stated cost of ₹7 lakh and a site of 3.3 acres.
When was it filed?
The application was filed on 3 Oct 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 20 Nov 2026 |
| Application filed | 3 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shashi Kumar |
| Land area | 3.3 acres (1.3 ha) |
| Project cost | ₹7 lakh |
| Village / locality | Aurahi |
| Taluk / tehsil | Gamharia |
| District | Madhepura |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01714 |
In context
18 applications in Madhepura since January 2022 are in the same category (Mining): 8 approved, 9 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 36 days from filing to approval. At 3.3 acres, this one is smaller than 78% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 6.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.
Where it is
Aurahi, Gamharia, Madhepura, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed "Brick Earth Excavation Project" for M/s New Baba Int Udyog at… — under environmental review, 300 m away
- soil mining project for Bricks of M/S M S C Bricks (Singh Traders) Mouza –… — environmental approval granted, 3.8 km away
- Environmental Clearance of soil mining project for Bricks of M/S B S C Bricks… — lapsed, 4.7 km away
- Retail out-let dealership of M/s Indian Oil Corporation Ltd. Location Within 6… — forest land use approved, 5.1 km away
- Diversion of 0.0255 Ha of Forest Land for Construction of Approach Road for… — forest land use approved, 5.2 km away
- Diversion of 0.02175 ha of forest land for construction of approach road for… — initial checks, 5.3 km away
- Proposed "Brick Earth Excavation Project" for M/s Raja Bricks at Mauja-… — initial checks, 9 km away
- Sand Mining Project, Madhepura Unit 02 Sand Ghat of District- Madhepura,… — environmental approval granted, 9.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.