Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Oct 2026 |
| Application filed | 21 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ramswrup Yadav |
| Land area | 2.7 acres (1.1 ha) |
| Project cost | ₹6 lakh |
| Village / locality | Firozpur |
| Taluk / tehsil | Asthawan |
| District | Nalanda |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01742 |
In context
163 applications in Nalanda since January 2022 are in the same category (Mining): 146 approved, 11 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 2.7 acres, this one is smaller than 100% of them.
No other mining lease on record is within 500 m of this site; 17 have applied within 5 km.
Where it is
Firozpur, Asthawan, Nalanda, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Earth Brick Soil Mining Project Located at Mauja-Sakrawan, Mauja No:… — environmental approval granted, 650 m away
- Brick Earth Mining for M/S M K S Int Udyog- Oiyaw Soil Brick Mining Project at… — environmental approval granted, 1.7 km away
- Brick Earth Mining Project M/s Prasad Int Udyog-Located Mauja-Woiao, Mauza… — environmental approval granted, 1.7 km away
- Brick Earth Mining for M/S M K S INT UDYOG - Noawan Soil Brick Mining Project — environmental approval granted, 1.7 km away
- Proposed Earth Brick Mining Project Located at Mauza-Charuawan, P.S-Sheikhopur… — environmental approval granted, 1.8 km away
- Brick Earth Mining for M/S MKS Int Udyog- Ugawan Soil Brick Mining Project… — environmental approval granted, 2 km away
- Brick Earth Mining for M/S M K S Int Udyog - Lakhnu Bigha Soil Brick Mining… — environmental approval granted, 2.9 km away
- Brick Earth Mining for M/S M D S Int Udyog - Mazidpur Soil Brick Mining Project — environmental approval granted, 3.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.