Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 19 May 2026 |
| Application filed | 24 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Dharmvir Kumar |
| Land area | 5.2 acres (2.1 ha) |
| Project cost | ₹6 lakh |
| Village / locality | Asarhi |
| Taluk / tehsil | Hilsa |
| District | Nalanda |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01931 |
In context
163 applications in Nalanda since January 2022 are in the same category (Mining): 146 approved, 11 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 5.2 acres, this one is larger than 52% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 8.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 4 mining leases have applied within 5 km.
Where it is
Asarhi, Hilsa, Nalanda, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Brick Earth Mining for M/S Shivam Int Udyog - Sardar Bigha Soil Brick Mining… — lapsed, 200 m away
- Proposed Brick Earth Mining for M/S Nisu Int Udyog - Maheshpur Soil Brick… — environmental approval granted, 3.1 km away
- Proposed Brick Earth Mining for M/S Shubham Int Udyog - Mandaksh Soil Brick… — environmental approval granted, 3.1 km away
- 33 KV Line From Ekangarsarai Gss to Hilsa Pss — lapsed, 4.5 km away
- Brick Earth Mining for M/S R.B.J BRICKS - Salehpur Soil Brick Mining Project… — environmental approval granted, 4.9 km away
- Brick Earth Mining for M/S Samta Bricks Udyog- Juniyar Soil Brick Mining… — environmental approval granted, 5.6 km away
- Hilsa Bypass (East) Including Two Number of Rob of Total Length 7.0718 Km — more information requested, 6.9 km away
- Brick Earth Mining for M/S King Int Udyog-Barari Soil Brick Mining Project — environmental approval granted, 7.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.