One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Sand Mining Project Vaishali Ganga- 6B on Ganga River of District- Vaishali,…
Project details
| Status | Under environmental review |
|---|---|
| Status since | 3 Oct 2026 |
| Application filed | 22 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Ved Prakash Singh |
| Land area | 30.6 acres (12.4 ha) |
| Project cost | ₹2 crore |
| Village / locality | Nao Barar |
| Taluk / tehsil | Raghopur |
| District | Vaishali |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01947 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 29 Oct 2026 | Under environmental review | 30.6 acres | ₹2 crore |
| Early planning filed 22 Jan 2026 (this page) | Under environmental review | 30.6 acres | ₹2 crore |
In context
110 applications in Vaishali since January 2022 are in the same category (Mining): 63 approved, 43 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 38 days from filing to approval. At 30.6 acres, this one is larger than 95% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 64.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 5 mining leases have applied within 5 km.
Where it is
Nao Barar, Raghopur, Vaishali, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand Mining Project Vaishali Ganga- 6B on Ganga River of District-… — under environmental review, 0 m away
- Vaishali Ganga 6 A Sand Ghat River - Ganga — environmental approval granted, 250 m away
- Vaishali Ganga 6 A Sand Ghat River - Ganga — cleared for impact study, 250 m away
- Proposed Brick Earth Mining for M/S VIKASH BRICKS (MARKA-RADHA)- Jafrabad Soil… — environmental approval granted, 2.1 km away
- Proposed Sand Mining Project of Area 15.0 Ha at Vaishali Ganga- 2A on Ganga… — environmental approval granted, 2.8 km away
- Proposed Sand Mining Project of Area 15.0 Ha at Vaishali Ganga- 2A on Ganga… — cleared for impact study, 2.8 km away
- The proposed project is for brick clay mining M/s. Vabani Bricks at Mauza-… — environmental approval granted, 4.9 km away
- Proposed Sand Mining Project of Area 10.50 Ha at Vaishali Ganga -4D on Ganga… — under environmental review, 5 km away
More from Ved Prakash Singh in Vaishali
- Sand Mining Project on Gandak river at Sand Block Vaishali Gandak – 2A of… — environmental approval granted
- Proposed Sand Mining Project of Area 15.0 Ha at Vaishali Ganga- 2A on Ganga… — environmental approval granted
- Proposed Sand Mining Project of Area 15.0 Ha at Vaishali Ganga- 2A on Ganga… — cleared for impact study
- Sand Mining Project on Gandak river at Sand Block Vaishali Gandak – 2A of… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.