Quick answers
What is this project?
4 Lane Elevated/At Grade Ganga Path connecting Munger (Safiabad) – Bariyarpur – Ghorghat – Sultanganj on Hybrid Annuity Mode (Length: 42 km) is a lapsed road project in Sikandarpur, Munger, Bihar. The site covers 614 acres.
Who is building it?
The applicant is Bihar State Road Development Corporation Limited.
Has it been approved?
No. The application was lapsed on 27 Nov 2026, so it is no longer under consideration.
Where is it?
In Sikandarpur, Munger, Bihar.
How big is it?
It has a stated cost of ₹5,327 crore and a site of 614 acres.
When was it filed?
The application was filed on 5 Aug 2026.
Project details
| Official title | Construction of 4 Lane Elevated/At Grade Ganga Path connecting Munger (Safiabad) – Bariyarpur – Ghorghat – Sultanganj on Hybrid Annuity Mode (Length: 42 km) |
|---|---|
| Status | Lapsed |
| Status since | 27 Nov 2026 |
| Application filed | 5 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Roads & highways |
| Applicant | Bihar State Road Development Corporation Limited |
| Land area | 614 acres (248.5 ha) |
| Project cost | ₹5,327 crore |
| Village / locality | Sikandarpur |
| Taluk / tehsil | Munger |
| District | Munger |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01965 |
In context
6 applications in Munger since January 2022 are in the same category (Roads & highways): 1 approved, 3 filed or under review, and 2 withdrawn, lapsed or rejected.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sikandarpur, Munger, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Brick Earth Mining for M/S R.P.C BRICKS - Tarapur Diyara Soil Brick… — under environmental review, 1000 m away
- Proposed Brick Earth Mining for M/S BRAHMA INT NIRMAN COMPANY - Kataria Soil… — initial checks, 1.1 km away
- Brick Earth Mining for M/S Jai Shree Ganesh Int Udyog - Bindadiyara/Tarapur… — environmental approval granted, 1.1 km away
- Carrying out Final Location survey for Bhagalpur -Jamalpur 3rd line ( 52.99 Km) — lapsed, 3.7 km away
- Proposed Brick Earth Mining for M/S MAA KAMAKHYA INT UDYOG - Karhariya Soil… — environmental approval granted, 4.4 km away
- Land Requirement for Demonstration Cum Practical Classes and Sports Ground for… — lapsed, 4.7 km away
- Land Requirement for Demonstration Cum Practical Classes and Sports Ground for… — under wildlife review, 4.7 km away
- Proposed Brick Earth Mining for M/S SNC Bricks - Karhariya Soil Brick Mining… — environmental approval granted, 4.8 km away
More from Bihar State Road Development Corporation Limited in Munger
- 4 Lane Elevated/At Grade Ganga Path connecting Munger (Safiabad) – Bariyarpur… — under environmental review
All 34 Bihar State Road Development Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.