| Status | Environmental approval granted |
|---|---|
| Status since | 18 Sept 2026 |
| Application filed | 25 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Muslim Husain |
| Land area | 2.4 acres (1 ha) |
| Project cost | ₹8 lakh |
| Village / locality | Kurari |
| Taluk / tehsil | Rampur |
| District | Kaimur (Bhabua) |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01988 |
In context
29 applications in Kaimur (Bhabua) since January 2022 are in the same category (Mining): 21 approved, 8 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 41 days from filing to approval. At 2.4 acres, this one is smaller than 100% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Kurari, Rampur, Kaimur (Bhabua), Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Brick Earth Mining for M/S S.K.S ENTERPRISES - Nisija Soil Brick… — under environmental review, 2.6 km away
- Brick Earth Mining for M/S Muskan Int Udyog - Belbhadra Soil Brick Mining… — environmental approval granted, 4.6 km away
- Retail outlet dealership of M/s Indian Oil Corportation Ltd. Location Between… — lapsed, 5.3 km away
- Proposed Brick Earth Mining Project for M/S RBD Int Udyog — environmental approval granted, 5.4 km away
- Brick Earth Mining for M/S MUSKAN INT UDYOG (MARKA-SONA) - Gurura Soil Brick… — environmental approval granted, 5.5 km away
- 979.76 Acres Chart Land in Diversion of forest land (Irrigation Division… — more information requested, 7.7 km away
- Expansion of Grain Based Ethanol Plant from 60 KLD to 120 KLD and… — under environmental review, 8.8 km away
- Brick Earth Mining for M/S Soni Int Udyog - Nevras Soil Brick Mining Project — environmental approval granted, 11.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.