Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 Nov 2026 |
| Application filed | 1 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Santosh Kumar |
| Land area | 22.2 acres (9 ha) |
| Project cost | ₹1.5 crore |
| Village / locality | Ramngar Diara |
| Taluk / tehsil | Bakhtiarpur |
| District | Patna |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01998 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 1 Oct 2026 (this page) | Environmental approval granted | 22.2 acres | ₹1.5 crore |
| Early planning filed 7 Jul 2026 | Under environmental review | 22.2 acres | ₹1.5 crore |
In context
180 applications in Patna since January 2022 are in the same category (Mining): 161 approved, 18 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 1 months from filing to approval. At 22.2 acres, this one is larger than 57% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Ramngar Diara, Bakhtiarpur, Patna, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ganga 09-B Sand Ghat at Riverbed of Ganga River — under environmental review, 0 m away
- Sand Mining Project of sand ghat Patna Ganga 7-G of Area 19.5 Ha on Ganga… — under environmental review, 1000 m away
- Sand Mining Project of sand ghat Patna Ganga 7-G of Area 19.5 Ha on Ganga… — under environmental review, 1000 m away
- Patna Ganga Sand Ghat No.- 07-F Sand Ghat at Riverbed of Ganga River — environmental approval granted, 1.1 km away
- Patna Ganga Sand Ghat No.- 07-F Sand Ghat at Riverbed of Ganga River — cleared for impact study, 1.1 km away
- Patna Ganga Sand Ghat No.-06-E Sand Ghat at Riverbed of Ganga River — cleared for impact study, 1.9 km away
- Ganga 06-D Balu Ghat at Riverbed of Ganga River — under environmental review, 2 km away
- Ganga 06-D Balu Ghat at Riverbed of Ganga River — under environmental review, 2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.