Quick answers
What is this project?
Proposed Brick Earth Mining for M/S Ginni Bricks Field - Muradpur Soil Brick Mining Project at Mauza- Muradpur, Village+P.O- Ayodhyaganj Bazar, P.S- Kursela, District- Katihar (Bihar) is a proposed mining project in Muradpur, Sameli, Katihar, Bihar. The site covers 6.7 acres.
Who is building it?
The applicant is Santosh Kumar Agrawal.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Muradpur, Sameli, Katihar, Bihar.
How big is it?
It has a stated cost of ₹7 lakh and a site of 6.7 acres.
When was it filed?
The application was filed on 24 Oct 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 24 Oct 2026 |
| Application filed | 24 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Santosh Kumar Agrawal |
| Land area | 6.7 acres (2.7 ha) |
| Project cost | ₹7 lakh |
| Village / locality | Muradpur |
| Taluk / tehsil | Sameli |
| District | Katihar |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02035 |
In context
72 applications in Katihar since January 2022 are in the same category (Mining): 49 approved, 16 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 39 days from filing to approval. At 6.7 acres, this one is larger than 81% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Muradpur, Sameli, Katihar, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Regarding Environmental Clearance of soil mining project for Bricks of M/s B R… — initial checks, 1.8 km away
- Toll Palza in SH-77 Road of Ch 7+100 under Road Construction Depertment, Road… — initial checks, 3.4 km away
- Mining project by M/S BHAGWATI BRICKS ,Mouza – Khera P.O-Khera , P.S-Falka… — environmental approval granted, 4.6 km away
- Diversion of 0.0135 Ha of Forest Land for Construction of Approach Road for… — forest land use approved, 11.4 km away
- Mining project by M/S BHAGWAN GITAFIELD(BGF),Mauza-Roniya, P.O- Guru Bazar,… — environmental approval granted, 14.7 km away
- Mining project by M/S H M T Bricks Mouza Marwa Po Marwa Anchal Korha Dist… — environmental approval granted, 15.8 km away
- Proposed Brick Earth Mining for M/S NIDHI BRICKS - Raunia Soil Brick Mining… — environmental approval granted, 15.9 km away
- Diversion of 0.0195 Ha of Forest Land for Construction of Approach Road for… — forest land use approved, 16.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.