Quick answers
What is this project?
Proposed Brick Earth Mining Project for M/S Swastik Int Nirmata at Mauza- Chhinegaon, Thana No.49, P.S+anchal- Barhara, District- Bhojpur, State- Bihar is a proposed mining project in Chhinegaon, Barhara, Bhojpur, Bihar. The site covers 4.9 acres.
Who is building it?
The applicant is Sushila Singh.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Chhinegaon, Barhara, Bhojpur, Bihar.
How big is it?
It has a stated cost of ₹33 lakh and a site of 4.9 acres.
When was it filed?
The application was filed on 21 Oct 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 20 Nov 2026 |
| Application filed | 21 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sushila Singh |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹33 lakh |
| Village / locality | Chhinegaon |
| Taluk / tehsil | Barhara |
| District | Bhojpur |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02056 |
In context
142 applications in Bhojpur since January 2022 are in the same category (Mining): 133 approved, 5 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 28 days from filing to approval. At 4.9 acres, this one is smaller than 89% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Chhinegaon, Barhara, Bhojpur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Brick Earth Mining for M/S Nutan Bricks - Gundi Soil Brick Mining… — environmental approval granted, 4.3 km away
- Retail out-let dealership of M/s NX100 PACIFIC BIOFUEL PVT Ltd. Location… — forest land use approved, 6.3 km away
- Diversion of 0.0195 Ha of Forest Land for Construction of Approach Road for… — forest land use approved, 6.9 km away
- Diversion of 0.02025 Ha of Forest Land for Construction of Approach Road for… — forest land use approved, 7.5 km away
- Diversion of 0.021 Ha of Forest Land for Construction of Approach Road for… — in-principle approval, conditions pending, 7.6 km away
- Proposed Brick Earth Mining for M/S A.D.P BRICKS - Balua Soil Brick Mining… — environmental approval granted, 7.7 km away
- Proposed Brick Earth Mining for M/S BNP BRICKS - Nargada Soil Brick Mining… — environmental approval granted, 8.1 km away
- Proposed Brick Earth Mining for M/S PRAGYA BRICKS - Bada Khawaspur Soil Brick… — environmental approval granted, 9.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.