Project details
| Official title | Proposed Brick Earth Mining Project for M/s B.L Bricks at Village/Mauza-Alahdadpur P.O-Nandlalpur, P.S-Vaishali, District- Vaishali, State-Bihar |
|---|---|
| Status | Under environmental review |
| Status since | 11 Nov 2026 |
| Application filed | 9 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Babu Lal Ray |
| Land area | 2.1 acres (0.9 ha) |
| Project cost | ₹44 lakh |
| Village / locality | Alahdadpur |
| Taluk / tehsil | Vaishali |
| District | Vaishali |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02093 |
In context
110 applications in Vaishali since January 2022 are in the same category (Mining): 63 approved, 43 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 38 days from filing to approval. At 2.1 acres, this one is smaller than 82% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 5.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Alahdadpur, Vaishali, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed brick earth mining project of M/s Babu Bricks located at Mauza –… — environmental approval granted, 350 m away
- Proposed Brick Earth Mining Project of Located at Mauza– Abdulapur, Po-… — environmental approval granted, 1.8 km away
- M/S Amar Bricks Proposed Brick Clay Mining Project at Mauza- Raypura, Block-… — under environmental review, 7.2 km away
- Proposed Soil/Earth Mining Project — returned to applicant, 8.2 km away
- Proposed Ordinary Soil / Earth Mining Project of M/s RSV Builders Pvt. Ltd… — environmental approval granted, 8.2 km away
- Diversion of 0.00825 Ha of Forest Land for Construction of Approach Road for… — more information requested, 8.4 km away
- 4 Lane Bakarpur-manikpur Section, Starting From Design Km 0.000 at Sitalpur… — environmental approval granted, 8.6 km away
- 4 Lane Bakarpur-manikpur Section, Starting From Design Km 0.000 at Sitalpur… — cleared for impact study, 8.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.