Quick answers
What is this project?
Sand Mining Project at Sand Block No.- 1C Sand Ghat on Son river at Mauza - Mahamadpur, Block - Daudnagar, District – Aurangabad, State - Bihar. (Area - 27.5 ha.) is an approved mining project in Muhamadpur, Daudnagar, Aurangabad, Bihar. The site covers 68 acres.
Who is building it?
The applicant is Damas Civil Construction India Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 26 Feb 2026), as of 27 Nov 2026.
Where is it?
In Muhamadpur, Daudnagar, Aurangabad, Bihar.
How big is it?
It has a stated cost of ₹9 crore and a site of 68 acres.
When was it filed?
The application was filed on 22 Jan 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 26 Feb 2026 |
| Application filed | 22 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Damas Civil Construction India Private Limited |
| Land area | 68 acres (27.5 ha) |
| Project cost | ₹9 crore |
| Village / locality | Muhamadpur |
| Taluk / tehsil | Daudnagar |
| District | Aurangabad |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02139 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 22 Jan 2026 (this page) | Environmental approval granted | 68 acres | ₹9 crore |
| Early planning filed 17 Sept 2025 | Cleared for impact study | 68 acres | ₹9 crore |
In context
145 applications in Aurangabad since January 2022 are in the same category (Mining): 127 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 68 acres, this one is smaller than 56% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 191.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 11 mining leases have applied within 5 km.
Where it is
Muhamadpur, Daudnagar, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Mining Project at Sand Block No.- 1C Sand Ghat on Son river at Mauza -… — cleared for impact study, 0 m away
- Proposed Sand Mining Project of Area 30.0 Ha at Aurangabad Sone- 2-A on Sone… — environmental approval granted, 350 m away
- Proposed Sand Mining Project of Area 30.0 Ha at Aurangabad Sone- 2-A on Sone… — cleared for impact study, 350 m away
- Sand Mining Project, Aurangabad Son 1 B Sand Ghat (Area - 20.0 Ha.) — environmental approval granted, 350 m away
- Sand Mining Project, Aurangabad Son 1 B Sand Ghat (Area - 20.0 Ha.) — cleared for impact study, 350 m away
- Proposed Sand Mining Project Aurangabad Sone- 2-B on Sone River of District-… — environmental approval granted, 600 m away
- Proposed Sand Mining Project Aurangabad Sone- 2-B on Sone River of District-… — cleared for impact study, 600 m away
- Proposed Sand Mining Project Aurangabad Sone-2C on Sone River of District-… — cleared for impact study, 800 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.