Quick answers
What is this project?
Sand Mining Project at Sand Block No. - 14A Sand Ghat located at Mouza - Dihara, Block - Obra, District - Aurangabad, State - Bihar (Area - 34.7 ha.) is a proposed mining project in Dihra, Obra, Aurangabad, Bihar. The site covers 85.7 acres.
Who is building it?
The applicant is Aditya Sagar.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 31 Jan 2026), as of 27 Nov 2026.
Where is it?
In Dihra, Obra, Aurangabad, Bihar.
How big is it?
It has a stated cost of ₹12.2 crore and a site of 85.7 acres.
When was it filed?
The application was filed on 14 Jan 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Sand Mining Project at Sand Block No. - 14A Sand Ghat located at Mouza - Dihara, Block -…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 31 Jan 2026 |
| Application filed | 14 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Aditya Sagar |
| Land area | 85.7 acres (34.7 ha) |
| Project cost | ₹12.2 crore |
| Village / locality | Dihra |
| Taluk / tehsil | Obra |
| District | Aurangabad |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02140 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 6 Apr 2026 | Environmental approval granted | 85.7 acres | ₹12.2 crore |
| Early planning filed 14 Jan 2026 (this page) | Cleared for impact study | 85.7 acres | ₹12.2 crore |
In context
145 applications in Aurangabad since January 2022 are in the same category (Mining): 127 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 85.7 acres, this one is larger than 79% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 295 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 27 mining leases have applied within 5 km.
Where it is
Dihra, Obra, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Mining Project at Sand Block No. - 14A Sand Ghat located at Mouza -… — environmental approval granted, 0 m away
- Sand Mining Project at Sand Block No- 14B Sand Ghat located at Mouza - Dihara,… — environmental approval granted, 250 m away
- Sand Mining Project at Sand Block No- 14B Sand Ghat located at Mouza - Dihara,… — cleared for impact study, 250 m away
- Sand Mining Project, Aurangabad Son 13-C Sand Ghat of District- Aurangabad,… — environmental approval granted, 300 m away
- Sand Mining Project, Aurangabad Son 13-C Sand Ghat of District- Aurangabad,… — cleared for impact study, 300 m away
- Proposed Sand Mining Project Aurangabad Sone-14-C on Sone River of District-… — environmental approval granted, 450 m away
- Proposed Sand Mining Project Aurangabad Sone-14-C on Sone River of District-… — cleared for impact study, 450 m away
- Project: Aurangabad Son 13 - B Sand Ghat, (Area- 26.0 Ha) Production-498600… — environmental approval granted, 550 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.