What is Developing? Open the mapMap

Cleared for impact studyMining · Aurangabad, Bihar

Sand Mining Project at Sand Block No. - 14A Sand Ghat located at Mouza - Dihara, Block - Obra, District - Aurangabad, State - Bihar (Area - 34.7 ha.)

Sand Mining Project at Sand Block No. - 14A Sand Ghat located at Mouza - Dihara, Block - Obra, District - Aurangabad, State - Bihar (Area - 34.7 ha.) is a proposed mining project in Dihra, Obra, Aurangabad, Bihar. The site covers 85.7 acres. Its stated project cost is ₹12.2 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 31 Jan 2026).

See it on the live map All projects in Aurangabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Sand Mining Project at Sand Block No. - 14A Sand Ghat located at Mouza - Dihara, Block - Obra, District - Aurangabad, State - Bihar (Area - 34.7 ha.) is a proposed mining project in Dihra, Obra, Aurangabad, Bihar. The site covers 85.7 acres.

Who is building it?

The applicant is Aditya Sagar.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 31 Jan 2026), as of 27 Nov 2026.

Where is it?

In Dihra, Obra, Aurangabad, Bihar.

How big is it?

It has a stated cost of ₹12.2 crore and a site of 85.7 acres.

When was it filed?

The application was filed on 14 Jan 2026.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Sand Mining Project at Sand Block No. - 14A Sand Ghat located at Mouza - Dihara, Block -…

Project details

StatusCleared for impact study
Status since31 Jan 2026
Application filed14 Jan 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantAditya Sagar
Land area85.7 acres (34.7 ha)
Project cost₹12.2 crore
Village / localityDihra
Taluk / tehsilObra
DistrictAurangabad
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-02140

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 6 Apr 2026Environmental approval granted85.7 acres₹12.2 crore
Early planning filed 14 Jan 2026 (this page)Cleared for impact study85.7 acres₹12.2 crore

In context

145 applications in Aurangabad since January 2022 are in the same category (Mining): 127 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 85.7 acres, this one is larger than 79% of them.

3 other mining leases have applied within 500 m of this site; together with this one they cover 295 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 27 mining leases have applied within 5 km.

Where it is

Dihra, Obra, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.