Quick answers
What is this project?
Proposed Brick Earth Mining Project for M/s A-1 Int Udyog at Mauza- Asawn & Awari, P.S + Block- Marhaura, District- Saran, State- Bihar is an approved mining project in Asawn, Marhaura, Saran, Bihar. The site covers 3.8 acres.
Who is building it?
The applicant is Arun Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 25 Aug 2026), as of 27 Nov 2026.
Where is it?
In Asawn, Marhaura, Saran, Bihar.
How big is it?
It has a stated cost of ₹42 lakh and a site of 3.8 acres.
When was it filed?
The application was filed on 17 Jul 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 25 Aug 2026 |
| Application filed | 17 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Arun Singh |
| Land area | 3.8 acres (1.5 ha) |
| Project cost | ₹42 lakh |
| Village / locality | Asawn |
| Taluk / tehsil | Marhaura |
| District | Saran |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02160 |
In context
42 applications in Saran since January 2022 are in the same category (Mining): 36 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3.8 acres, this one is smaller than 57% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Asawn, Marhaura, Saran, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.007875 Ha of Forest Land for Construction of Approach Road for… — forest land use approved, 2.4 km away
- Proposed Brick Earth Mining project of M/s A.R. Int at Mauza- Israuli, Block-… — environmental approval granted, 6.1 km away
- Brick kiln mining project of M/S Puja Int Udyog at Mauza- Narharpur Chamari &… — environmental approval granted, 6.4 km away
- Widening & Strengthening Work Km 0.00 to 17.48 of Chapra (Khaira)- Marhowrah… — lapsed, 6.7 km away
- Proposed Brick Earth mining project of M/s- A1 Int Udyog at Mauza-… — environmental approval granted, 7 km away
- Diversion of 0.0225 Ha of Forest Land for Construction of Approach Road for… — forest land use approved, 7.9 km away
- Diversion of 0.00975 Ha of Forest Land for Construction of Approach Road for… — more information requested, 9.1 km away
- City Gas Distribution Project Muzaffarpur GA — lapsed, 11.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.