Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 25 Aug 2026 |
| Application filed | 29 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Manisha Kumari |
| Land area | 40.8 acres (16.5 ha) |
| Project cost | ₹5.1 crore |
| Village / locality | Kamta |
| Taluk / tehsil | Kaler |
| District | Arwal |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02203 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 29 Jul 2026 (this page) | Environmental approval granted | 40.8 acres | ₹5.1 crore |
| Early planning filed 4 Dec 2025 | Cleared for impact study | 40.8 acres | ₹5.1 crore |
In context
92 applications in Arwal since January 2022 are in the same category (Mining): 78 approved, 14 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 29 days from filing to approval. At 40.8 acres, this one is smaller than 77% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 131 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 22 mining leases have applied within 5 km.
Where it is
Kamta, Kaler, Arwal, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand Mining Project Arwal Sone-09 (Kamta Bathe-03) on Sone River at… — cleared for impact study, 0 m away
- Sand Mining Project, Arwal Son - 09 (Kamta - 02) Sand Ghat at Khata No.- 466.… — cleared for impact study, 400 m away
- Proposed Sand Mining Project Arwal Sone-10 (Masadpur 1-Ghat A) on Sone River… — environmental approval granted, 400 m away
- Proposed Sand Mining Project Arwal Sone-10 (Masadpur 1-Ghat A) on Sone River… — cleared for impact study, 400 m away
- Sand Mining Project, Arwal Son - 09 (Kamta - 01) Sand Ghat at Khata No.- 466.… — under environmental review, 750 m away
- Sand Mining Project, Arwal Son - 09 (Kamta - 01) Sand Ghat at Khata No.- 466.… — under environmental review, 750 m away
- Sand mining project of Sand Block No.– Arwal Son-10 (Masadpur 1- ghat B) of… — environmental approval granted, 750 m away
- Sand mining project of Sand Block No.– Arwal Son-10 (Masadpur 1- ghat B) of… — cleared for impact study, 750 m away
More from Manisha Kumari in Arwal
- Proposed Sand Mining Project Arwal Sone-10 (Masadpur 1-Ghat A) on Sone River… — environmental approval granted
- Proposed Sand Mining Project Arwal Sone-10 (Masadpur 1-Ghat A) on Sone River… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.