Quick answers
What is this project?
Gorakhpur Siliguri High Speed Access Controlled Corridor, Bihar Section, starting from km 86.680 (near Gandak River) to km 175.750 (Interchange at NH-227F) in the State of Bihar. Total Design Length 89.070 km is a proposed road project in Jagdishpur, Harsidhi, Purba Champaran, Bihar. The site covers 1,534.3 acres.
Who is building it?
The applicant is National Highway Authority of India.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Jagdishpur, Harsidhi, Purba Champaran, Bihar.
How big is it?
It has a stated cost of ₹3,719 crore and a site of 1,534.3 acres.
When was it filed?
The application was filed on 7 Mar 2026.
Project details
| Official title | Development of Gorakhpur Siliguri High Speed Access Controlled Corridor, Bihar Section, starting from km 86.680 (near Gandak River) to km 175.750 (Interchange at NH-227F) in the State of Bihar. Total Design Length 89.070 km. |
|---|---|
| Status | Returned to applicant |
| Status since | 4 May 2026 |
| Application filed | 7 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Roads & highways |
| Applicant | National Highway Authority of India |
| Land area | 1,534.3 acres (620.9 ha) |
| Project cost | ₹3,719 crore |
| Village / locality | Jagdishpur |
| Taluk / tehsil | Harsidhi |
| District | Purba Champaran |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02244 |
In context
7 applications in Purba Champaran since January 2022 are in the same category (Roads & highways): 3 approved, 3 filed or under review, and 1 withdrawn, lapsed or rejected.
Where it is
Jagdishpur, Harsidhi, Purba Champaran, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Brick Earth mining project of M/S Dev Star Bricks — environmental approval granted, 6.8 km away
- Proposed Brick Earth mining project Village/Mauza- Bahadurpur, P.O- Areraj,… — environmental approval granted, 7 km away
- Greenfield, Gorakhpur Siliguri High Speed Access Controlled corridor under… — more information requested, 7.3 km away
- Proposed Brick Earth Mining for M/S SANI INT UDYOG - Bahadurpur Soil Brick… — environmental approval granted, 8.3 km away
- Brick Earth Mining of M/s. J.M.S. Bricks — environmental approval granted, 8.3 km away
- Brick Earth mining of M/s. Rai & Co. — environmental approval granted, 9 km away
- Proposed "Brick Earth Excavation Project" for M/s Jagdamba Bricks at Thana… — under environmental review, 10.5 km away
- Brick Earth Mining project of M/s Icon Bricks — under environmental review, 11.5 km away
More from National Highway Authority of India in Purba Champaran
- Greenfield, Gorakhpur Siliguri High Speed Access Controlled corridor under… — more information requested
- Construction and Up gradation to Four Lane from Sahebgan Design.Ch. Km 44+650,… — lapsed
- Four Lane Highway From Areraj to Bettiah Section of Nh-139w (From Km 0.000 to… — forest land use approved
6 National Highways Authority of India (NHAI) projects in Purba Champaran
All 548 National Highways Authority of India (NHAI) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.