Quick answers
What is this project?
Proposed Brick Earth Mining Project for M/s Sun Bricks at Mauza- Bisambharpur, P.O- Chanayan Bandh, P.S + Block- Majhaulia, District- West Champaran, State- Bihar is an approved mining project in Bisambharpur, Majhaulia, Pashchim Champaran, Bihar. The site covers 4.5 acres.
Who is building it?
The applicant is Shatrughan Prasad.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 9 Sept 2026), as of 27 Nov 2026.
Where is it?
In Bisambharpur, Majhaulia, Pashchim Champaran, Bihar.
How big is it?
It has a stated cost of ₹43 lakh and a site of 4.5 acres.
When was it filed?
The application was filed on 24 Jul 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 9 Sept 2026 |
| Application filed | 24 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shatrughan Prasad |
| Land area | 4.5 acres (1.8 ha) |
| Project cost | ₹43 lakh |
| Village / locality | Bisambharpur |
| Taluk / tehsil | Majhaulia |
| District | Pashchim Champaran |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02277 |
In context
35 applications in Pashchim Champaran since January 2022 are in the same category (Mining): 17 approved, 16 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 35 days from filing to approval. At 4.5 acres, this one is smaller than 63% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Bisambharpur, Majhaulia, Pashchim Champaran, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Brick Earth Mining Project for M/S S.K.O ENT Udyog at Mauza-… — under environmental review, 2.3 km away
- Proposed Brick Earth Mining Project for M/S Vikash Int Udyog at Mauza-… — environmental approval granted, 3.4 km away
- Proposed Brick Earth Mining for M/S M. N Verma Bricks Barwat Pasrain Soil… — under environmental review, 7.5 km away
- Majhaulia Sugar Industries — initial checks, 8 km away
- Majhaulia Sugar Industries — initial checks, 8 km away
- Proposed Brick Earth Mining for M/S Shiva Int Udyog Shampur Soil Brick Mining… — environmental approval granted, 10.9 km away
- Proposed Brick Earth Mining for M/S Savitri Int Udyog Rampurwa Soil Brick… — under environmental review, 11.3 km away
- Proposed Brick Earth Mining Project for M/S JVS Int Udyog — initial checks, 15.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.