Quick answers
What is this project?
Expansion of Grain Based Distillery from 450 KLD to 750 KLD Capacity for Production of Ethanol/ENA (inlucidng Ethanol Byproducts), CO2 Derivatives & Cogeneration Power Plant from 10 MW to 25 MW based on Biomass as Fuel by Westwell Biorefineries Pvt. Ltd. at Vill. Rajapatti Kothi, Block Baikunthpur, Dist. Gopalganj, State Bihar is a proposed industrial project in Raja Patti, Baikunthpur, Gopalganj, Bihar. The site covers 35.5 acres.
Who is building it?
The applicant is Westwell Biorefineries Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Raja Patti, Baikunthpur, Gopalganj, Bihar.
How big is it?
It has a stated cost of ₹423.3 crore and a site of 35.5 acres.
When was it filed?
The application was filed on 19 Aug 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 7 Oct 2026 |
| Application filed | 19 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Westwell Biorefineries Private Limited |
| Land area | 35.5 acres (14.4 ha) |
| Project cost | ₹423.3 crore |
| Village / locality | Raja Patti |
| Taluk / tehsil | Baikunthpur |
| District | Gopalganj |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02288 |
In context
5 applications in Gopalganj since January 2022 are in the same category (Industry): 2 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Raja Patti, Baikunthpur, Gopalganj, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Project by Westwell Biorefineries Private Limited — initial checks, 50 m away
- Westwell Biorefineries Private Limited (Formerly : Sona Sati Organics Pvt Ltd) — initial checks, 150 m away
- Westwell Biorefineries Private Limited (Formerly : Sona Sati Organics Pvt Ltd) — returned to applicant, 150 m away
- Westwell Biorefineries Private Limited (Formerly : Sona Sati Organics Pvt Ltd) — environmental approval granted, 150 m away
- 4-laning of Masrakh to Chakia (Km 86 to Km 143 of NH-227A ) and Chakia to… — more information requested, 4.6 km away
- Diversion of 0.0105 Ha of Forest Land for Construction of Approach Road for… — forest land use approved, 5.1 km away
- M/S Highway Fuel Pump of KRRISHAY BIOFUEL PVT. LTD. Location Mauza Chamanpura… — more information requested, 12.2 km away
- Diversion of 0.01515 Ha of Forest Land for Construction of Approach Road for… — lapsed, 12.5 km away
More from Westwell Biorefineries Private Limited in Gopalganj
- Project by Westwell Biorefineries Private Limited — initial checks
- Westwell Biorefineries Private Limited (Formerly : Sona Sati Organics Pvt Ltd) — initial checks
- Westwell Biorefineries Private Limited (Formerly : Sona Sati Organics Pvt Ltd) — returned to applicant
- Westwell Biorefineries Private Limited (Formerly : Sona Sati Organics Pvt Ltd) — environmental approval granted
All 5 Westwell Biorefineries projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.