What is Developing? Open the mapMap

Under environmental reviewIndustry · Gopalganj, Bihar

Expansion of Grain Based Distillery from 450 KLD to 750 KLD Capacity for Production of Ethanol/ENA (inlucidng Ethanol Byproducts), CO2 Derivatives & Cogeneration Power Plant from 10 MW to 25 MW based on Biomass as Fuel by Westwell Biorefineries Pvt. Ltd. at Vill. Rajapatti Kothi, Block Baikunthpur, Dist. Gopalganj, State Bihar

Expansion of Grain Based Distillery from 450 KLD to 750 KLD Capacity for Production of Ethanol/ENA (inlucidng Ethanol Byproducts), CO2 Derivatives & Cogeneration Power Plant from 10 MW to 25 MW based on Biomass as Fuel by Westwell Biorefineries Pvt. Ltd. at Vill. Rajapatti Kothi, Block Baikunthpur, Dist. Gopalganj, State Bihar is a proposed industrial project in Raja Patti, Baikunthpur, Gopalganj, Bihar. The site covers 35.5 acres. Its stated project cost is ₹423.3 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 7 Oct 2026).

See it on the live map All projects in Gopalganj

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Grain Based Distillery from 450 KLD to 750 KLD Capacity for Production of Ethanol/ENA (inlucidng Ethanol Byproducts), CO2 Derivatives & Cogeneration Power Plant from 10 MW to 25 MW based on Biomass as Fuel by Westwell Biorefineries Pvt. Ltd. at Vill. Rajapatti Kothi, Block Baikunthpur, Dist. Gopalganj, State Bihar is a proposed industrial project in Raja Patti, Baikunthpur, Gopalganj, Bihar. The site covers 35.5 acres.

Who is building it?

The applicant is Westwell Biorefineries Private Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Raja Patti, Baikunthpur, Gopalganj, Bihar.

How big is it?

It has a stated cost of ₹423.3 crore and a site of 35.5 acres.

When was it filed?

The application was filed on 19 Aug 2026.

Project details

StatusUnder environmental review
Status since7 Oct 2026
Application filed19 Aug 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantWestwell Biorefineries Private Limited
Land area35.5 acres (14.4 ha)
Project cost₹423.3 crore
Village / localityRaja Patti
Taluk / tehsilBaikunthpur
DistrictGopalganj
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-02288

In context

5 applications in Gopalganj since January 2022 are in the same category (Industry): 2 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Raja Patti, Baikunthpur, Gopalganj, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Westwell Biorefineries Private Limited in Gopalganj

All 5 Westwell Biorefineries projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.