What is this project?
Proposed Brick Earth Mining Project for M/S Maa Tara Int Udyog at Mauza + P.O- Atlakha, P.S- Basnahi, Block- Sonbarsa, District- Saharsa, State- Bihar is an approved mining project in Atlaka, Sonbarsa, Saharsa, Bihar. The site covers 2.6 acres.
Who is building it?
The applicant is Pramod Kumar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 5 Nov 2026), as of 27 Nov 2026.
Where is it?
In Atlaka, Sonbarsa, Saharsa, Bihar.
How big is it?
It has a stated cost of ₹34 lakh and a site of 2.6 acres.
When was it filed?
The application was filed on 7 Oct 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 5 Nov 2026 |
| Application filed | 7 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Pramod Kumar |
| Land area | 2.6 acres (1.1 ha) |
| Project cost | ₹34 lakh |
| Village / locality | Atlaka |
| Taluk / tehsil | Sonbarsa |
| District | Saharsa |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02304 |
In context
18 applications in Saharsa since January 2022 are in the same category (Mining): 18 approved, 0 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 2.6 acres, this one is smaller than 83% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Atlaka, Sonbarsa, Saharsa, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Ghat Mining Project (Saharsa Sursar River Unit 03) at Riverbed of Sursar… — environmental approval granted, 3.4 km away
- Sand Ghat Mining Project (Saharsa Sursar River Unit 03) at Riverbed of Sursar… — cleared for impact study, 3.4 km away
- Saharsa Tilawe River Unit 01 — environmental approval granted, 9.8 km away
- Saharsa Tilawe River Unit 01 — cleared for impact study, 9.8 km away
- Diversion of 0.0195 Ha of Forest Land for Construction of Approach Road for… — forest land use approved, 10.9 km away
- Sand Ghat Mining Project (Saharsa Tilawe River Unit 02) at Riverbed of Tilawe… — cleared for impact study, 12.3 km away
- Sand Ghat Mining Project (Saharsa Tilawe River Unit 02) at Riverbed of Tilawe… — environmental approval granted, 12.3 km away
- Diversion of 0.01725 Ha of Forest Land for Construction of Approach Road for… — forest land use approved, 13.4 km away