Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Oct 2026 |
| Application filed | 16 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ramanjee Thakur |
| Land area | 3.4 acres (1.4 ha) |
| Project cost | ₹8 lakh |
| Village / locality | Lagwa Bais |
| Taluk / tehsil | Gora Bauram |
| District | Darbhanga |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02391 |
In context
92 applications in Darbhanga since January 2022 are in the same category (Mining): 61 approved, 29 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 37 days from filing to approval. At 3.4 acres, this one is smaller than 70% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 10.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.
Where it is
Lagwa Bais, Gora Bauram, Darbhanga, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Brick clay mining project at M/s MAA JWALA INT UDYOG at Mauja-… — under environmental review, 350 m away
- Brick Earth Mining project of M/s- Kumar Int Udyog at Mauza- Bais Lagma,… — under environmental review, 400 m away
- Brick Earth Mining for M/S Janta Int Udyog- Naribhadawn Soil Brick Mining… — environmental approval granted, 1.9 km away
- Mining project by M/s K.B.R. Int Udyog at Mauza- Pali, Block- Ghanshyampur,… — environmental approval granted, 6.9 km away
- Proposed Brick clay mining project at Mauja- Uchti, Block: Biraul, District:… — under environmental review, 9.6 km away
- Proposed Brick Earth Mining for M/S S.S.K Int Udyog at Vill/Mauja- Neuri,… — initial checks, 9.6 km away
- Brick Earth Mining project of M/s Chandan Bricks Udyog at Mauza- Mahinam,… — environmental approval granted, 10.6 km away
- Diversion of 0.0195 Ha of Forest Land for Construction of Approach Road for… — lapsed, 10.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.