What is Developing? Open the mapMap

Initial checksMining · Madhepura, Bihar

Proposed "Brick Earth Excavation Project" for M/s B Swastik B Int Udyog at Mauja- Jorgama, Halka- Jorgama, P.O.-Jorgama, P.S.- Murliganj, Thana NO.- 260, Anchal- Murliganj, District- Madhepura (Bihar)

Proposed "Brick Earth Excavation Project" for M/s B Swastik B Int Udyog at Mauja- Jorgama, Halka- Jorgama, P.O.-Jorgama, P.S.- Murliganj, Thana NO.- 260, Anchal- Murliganj, District- Madhepura (Bihar) is a proposed mining project in Jorgawan G.P., Murliganj, Madhepura, Bihar. The site covers 4.3 acres. Its stated project cost is ₹7 lakh. As of 27 Nov 2026, its status is “Initial checks” (since 2 Oct 2026).

See it on the live map All projects in Madhepura

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed "Brick Earth Excavation Project" for M/s B Swastik B Int Udyog at Mauja- Jorgama, Halka- Jorgama, P.O.-Jorgama, P.S.- Murliganj, Thana NO.- 260, Anchal- Murliganj, District- Madhepura (Bihar) is a proposed mining project in Jorgawan G.P., Murliganj, Madhepura, Bihar. The site covers 4.3 acres.

Who is building it?

The applicant is Kishan Lal Sharma.

Has it been approved?

Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.

Where is it?

In Jorgawan G.P., Murliganj, Madhepura, Bihar.

How big is it?

It has a stated cost of ₹7 lakh and a site of 4.3 acres.

When was it filed?

The application was filed on 2 Oct 2026.

Project details

StatusInitial checks
Status since2 Oct 2026
Application filed2 Oct 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantKishan Lal Sharma
Land area4.3 acres (1.7 ha)
Project cost₹7 lakh
Village / localityJorgawan G.P.
Taluk / tehsilMurliganj
DistrictMadhepura
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-02415

In context

18 applications in Madhepura since January 2022 are in the same category (Mining): 8 approved, 9 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 36 days from filing to approval. At 4.3 acres, this one is smaller than 56% of them.

No other mining lease on record has applied within 5 km of this site.

Where it is

Jorgawan G.P., Murliganj, Madhepura, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.