Quick answers
What is this project?
Brick Earth Mining for M/S GUPTA BRICKS INDUSTRIES - Sirade Soil Brick Mining Project at Mauza-Sirade, Village-Siradepatti, P.O+P.S-Saharsa, Distt- Saharsa (Bihar) is an approved mining project in Dighia, Kahara, Saharsa, Bihar. The site covers 3.7 acres.
Who is building it?
The applicant is Rahul Kumar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 16 Oct 2026), as of 27 Nov 2026.
Where is it?
In Dighia, Kahara, Saharsa, Bihar.
How big is it?
It has a stated cost of ₹5 lakh and a site of 3.7 acres.
When was it filed?
The application was filed on 5 Sept 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Oct 2026 |
| Application filed | 5 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Rahul Kumar |
| Land area | 3.7 acres (1.5 ha) |
| Project cost | ₹5 lakh |
| Village / locality | Dighia |
| Taluk / tehsil | Kahara |
| District | Saharsa |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02547 |
In context
18 applications in Saharsa since January 2022 are in the same category (Mining): 18 approved, 0 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 3.7 acres, this one is larger than 50% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Dighia, Kahara, Saharsa, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Road Over Bridge, its Approach and Service Road in Between Saharsa… — initial checks, 3.7 km away
- Proposed Brick Earth Mining for M/S M.H BRICKS (TATA)- Saharsa Soil Brick… — environmental approval granted, 4.1 km away
- Diversion of 0.030 ha of forest land for construction of approach road for… — lapsed, 5.4 km away
- Shree Narayan Medical Institute & Hospital — environmental approval granted, 6.1 km away
- Diversion of 0.036 ha of forest land for construction of approach road for… — forest land use approved, 6.2 km away
- Diversion of 0.0105 Ha of Forest Land for Construction of Approach Road for… — lapsed, 6.9 km away
- Proposed Brick Earth Mining Project for M/S Sim Bricks at Mauza + P.O-… — environmental approval granted, 7 km away
- Diversion of 0.01275 Ha of Forest Land for Construction of Approach Road for… — forest land use approved, 9.4 km away
More from Rahul Kumar in Saharsa
- Diversion of 0.01275 Ha of Forest Land for Construction of Approach Road for… — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.