Quick answers
What is this project?
Brick Earth Mining for M/S N.M. ITT UDYOG - Piprakhas Soil Brick Mining Project at Mauza+Village-Piprakhas, P.O+P.S-Mirganj District- Gopalganj (Bihar) is an approved mining project in Kandhgopi, Hathua, Gopalganj, Bihar. The site covers 3.9 acres.
Who is building it?
The applicant is Maya Sah.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 18 Sept 2026), as of 27 Nov 2026.
Where is it?
In Kandhgopi, Hathua, Gopalganj, Bihar.
How big is it?
It has a stated cost of ₹5 lakh and a site of 3.9 acres.
When was it filed?
The application was filed on 31 Aug 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 18 Sept 2026 |
| Application filed | 31 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Maya Sah |
| Land area | 3.9 acres (1.6 ha) |
| Project cost | ₹5 lakh |
| Village / locality | Kandhgopi |
| Taluk / tehsil | Hathua |
| District | Gopalganj |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02556 |
In context
23 applications in Gopalganj since January 2022 are in the same category (Mining): 19 approved, 3 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 29 days from filing to approval. At 3.9 acres, this one is smaller than 65% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Kandhgopi, Hathua, Gopalganj, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.02265 Ha of Forest Land for Construction of Approach Road for… — lapsed, 1000 m away
- Proposed Brick Earth Mining Project for M/S 2X Int Udyog at Vill/mauza:… — initial checks, 4.1 km away
- Proposed Brick Earth Mining Project for M/S A.B.M Bricks — environmental approval granted, 4.2 km away
- Kisan Biofuel Retail outlet dealership of M/S NX100 Pacific Biofuel Pvt. Ltd… — more information requested, 4.7 km away
- Diversion of 0.01515 Ha of Forest Land for Construction of Approach Road for… — lapsed, 5.5 km away
- Diversion of 0.02325 Ha of Forest Land for Construction of Approach Road for… — lapsed, 6.3 km away
- Proposed Brick Earth Mining for M/S Rahi Int Udyog Bangra, Sohagpur Soil Brick… — environmental approval granted, 7.6 km away
- Proposed Brick Earth Mining for M/S R E B Int Udyog - Deoriya Soil Brick… — environmental approval granted, 7.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.