Project details
| Official title | Brick Earth Mining for M/S R B C Int Udyog- Kamalbigha Soil Brick Mining Project at Village- Kamalbigha, P.O- Bindidih, P.S- Rajgir, District- Nalanda (Bihar) |
|---|---|
| Status | Environmental approval granted |
| Status since | 27 Feb 2026 |
| Application filed | 8 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Gudiya Devi |
| Land area | 5.1 acres (2.1 ha) |
| Project cost | ₹6 lakh |
| Village / locality | Gor Bigha |
| Taluk / tehsil | Silao |
| District | Nalanda |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02623 |
In context
163 applications in Nalanda since January 2022 are in the same category (Mining): 146 approved, 11 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 5.1 acres, this one is smaller than 53% of them.
No other mining lease on record is within 500 m of this site; 14 have applied within 5 km.
Where it is
Gor Bigha, Silao, Nalanda, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Brick Earth Mining for M/S N- VIP Int Udyog - Kamal Bigha Soil Brick Mining… — environmental approval granted, 550 m away
- Brick Earth Mining for M/S J.B.C. Int Udyog - Mirzapur Kamalbigha Soil Brick… — environmental approval granted, 600 m away
- Proposed Brick Earth Mining for M/S Hero Int Udyog - Belaur Soil Brick Mining… — environmental approval granted, 1.3 km away
- Proposed Brick Earth Mining for M/S Tata Int Udyog - Balaur Soil Brick Mining… — environmental approval granted, 1.5 km away
- OFC laying in Nalanda District — lapsed, 1.9 km away
- Brick Earth Mining for M/S Baba Bricks- Chandimau Soil Brick Mining Project — environmental approval granted, 2 km away
- Ghostawan Soil brick Mine — environmental approval granted, 2.2 km away
- Brick Earth Mining for M/S BHAWANI INT UDYOG - Chamardiha Soil Brick Mining… — under environmental review, 2.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.