Quick answers
What is this project?
Proposed Brick Earth Mining for M/S JMD INT UDYOG - Salaiya Soil Brick Mining Project at Mauza+Village+P.O- Salaiya, P.S-Madanpur, District-Aurangabad (Bihar) is an approved mining project in Salaiya, Madanpur, Aurangabad, Bihar. The site covers 0.4 acres.
Who is building it?
The applicant is Devendra Kumar Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 8 Oct 2026), as of 27 Nov 2026.
Where is it?
In Salaiya, Madanpur, Aurangabad, Bihar.
How big is it?
It has a stated cost of ₹7 lakh and a site of 0.4 acres.
When was it filed?
The application was filed on 11 Sept 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 8 Oct 2026 |
| Application filed | 11 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Devendra Kumar Singh |
| Land area | 1,700 m² |
| Project cost | ₹7 lakh |
| Village / locality | Salaiya |
| Taluk / tehsil | Madanpur |
| District | Aurangabad |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02696 |
In context
145 applications in Aurangabad since January 2022 are in the same category (Mining): 127 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 0.4 acres, this one is smaller than 100% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Salaiya, Madanpur, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Brick Earth Mining for M/S NP BRICKS - Pateya Soil Brick Mining… — environmental approval granted, 4.8 km away
- Brick Earth Mining for M/S Janta Int Udyog- Tetarchak Soil Brick Mining… — environmental approval granted, 5.7 km away
- Block -3 Sandhail Stone Mine by "Bihar State Mining Corporation Limited" — under environmental review, 8.3 km away
- Block -1 Sandhail Stone Mine by "Bihar State Mining Corporation Limited" — under environmental review, 8.5 km away
- Block -2 Sandhail Stone Mine by "Bihar State Mining Corporation Limited" — under environmental review, 8.5 km away
- Proposed Brick Earth Mining for M/S OM INT UDYOG - Dholikhap Soil Brick Mining… — environmental approval granted, 9.3 km away
- Diversion of 0.02925 Ha of Forest Land for Construction of Approach Road for… — lapsed, 10.6 km away
- Diversion of 0.01725 Ha of Forest Land for Construction of Approach Road for… — more information requested, 11.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.