One of 2 filings for this project. The project's main page, with every filing and where each stands: Brick Earth Mining for M/S Ratan Int Udyog- Kothia Soil Brick Mining Project…
Project details
| Status | Withdrawn |
|---|---|
| Status since | 8 Jan 2026 |
| Application filed | 8 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ratan Kumar Jha |
| Land area | 4.1 acres (1.7 ha) |
| Project cost | ₹5 lakh |
| Village / locality | Kothia Bhareul |
| Taluk / tehsil | Jhanjharpur |
| District | Madhubani |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02734 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 20 Jan 2026 | Environmental approval granted | 4.1 acres | ₹5 lakh |
| New project filed 8 Jan 2026 (this page) | Withdrawn | 4.1 acres | ₹5 lakh |
In context
152 applications in Madhubani since January 2022 are in the same category (Mining): 125 approved, 19 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 4.1 acres, this one is smaller than 70% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Kothia Bhareul, Jhanjharpur, Madhubani, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Brick Earth Mining for M/S Ratan Int Udyog- Kothia Soil Brick Mining Project… — environmental approval granted, 50 m away
- Proposed Brick Earth Mining for M/S NIRMALA INT UDYOG - Raiyam, Kothiya Soil… — environmental approval granted, 3.1 km away
- Proposed Brick Earth Mining for M/S NEW INDIAN INT UDYOG - Biraul Soil Brick… — initial checks, 3.4 km away
- Brick Earth Mining for M/S Shyama Ent Udyog- Partapur Soil Brick Mining Project — environmental approval granted, 3.4 km away
- Diversion of 0.032625 ha of forest land for construction of approach road for… — lapsed, 3.8 km away
- Sand Mining Project of Area 13.63 Ha at Madhubani Cluster-4 ( includes 3 sand… — environmental approval granted, 5 km away
- Sand Mining Project of Area 13.63 Ha at Madhubani Cluster-4 ( includes 3 sand… — cleared for impact study, 5 km away
- Brick Earth Mining for M/S Sachin Ent Udyog - Simra Soil Brick Mining Project — environmental approval granted, 5.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.