Quick answers
What is this project?
Proposed Brick Earth Mining for M/S S.B.F. Brick Udyog - Madhuban Bediban Soil Brick Mining Project at Vill-Madhuban Bediban, P.O-Damodarpur, P.S-Pipra, Distt-East Champaran (Bihar) is an approved mining project in Madhuban Bediban, Chakia(Pipra), Purba Champaran, Bihar. The site covers 4 acres.
Who is building it?
The applicant is Vijay Kumar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 Jul 2026), as of 27 Nov 2026.
Where is it?
In Madhuban Bediban, Chakia(Pipra), Purba Champaran, Bihar.
How big is it?
It has a stated cost of ₹5 lakh and a site of 4 acres.
When was it filed?
The application was filed on 26 May 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 Jul 2026 |
| Application filed | 26 May 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Vijay Kumar |
| Land area | 4 acres (1.6 ha) |
| Project cost | ₹5 lakh |
| Village / locality | Madhuban Bediban |
| Taluk / tehsil | Chakia(Pipra) |
| District | Purba Champaran |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02871 |
In context
45 applications in Purba Champaran since January 2022 are in the same category (Mining): 30 approved, 15 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 42 days from filing to approval. At 4 acres, this one is smaller than 60% of them.
No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.
Where it is
Madhuban Bediban, Chakia(Pipra), Purba Champaran, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Brick Earth Mining for M/S KUNTI BRICKS FIELD - Chakania Soil Brick Mining… — environmental approval granted, 2.3 km away
- Brick Earth Mining for M/S R B C Int Udyog - Bairiya Soil Brick Mining Project — environmental approval granted, 3.2 km away
- Brick Earth Mining for M/S Maa Janki Int Udyog - Bairiya Soil Brick Mining… — environmental approval granted, 3.4 km away
- Sand Mining Project of Area 18.63 Ha at East Champaran Unit-5 ( includes 4… — environmental approval granted, 3.6 km away
- Sand Mining Project of Area 18.63 Ha at East Champaran Unit-5 ( includes 4… — cleared for impact study, 3.6 km away
- Proposed Brick Earth mining project at M/S H.B CONSTRUCTION — environmental approval granted, 4.4 km away
- Proposed "Brick Earth Excavation Project" for M/s Shakti Bricks at Thana… — under environmental review, 5 km away
- Proposed Brick Earth Mining for M/S MATA INT UDYOG - Bherkhiya Soil Brick… — environmental approval granted, 5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.