Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 27 Feb 2026 |
| Application filed | 7 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Madan Sah |
| Land area | 4.6 acres (1.9 ha) |
| Project cost | ₹6 lakh |
| Village / locality | Jagatpur |
| Taluk / tehsil | Madhubani |
| District | Madhubani |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02876 |
In context
152 applications in Madhubani since January 2022 are in the same category (Mining): 125 approved, 19 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 4.6 acres, this one is smaller than 53% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 8.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 1 mining lease has applied within 5 km.
Where it is
Jagatpur, Madhubani, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Brick Earth Mining Project at Mauza/Village + P.O - Jagatpur, P.S-… — environmental approval granted, 450 m away
- Rahika To Rampatti-Madhubani Bypass of NH-527A — more information requested, 2.9 km away
- Diversion of 0.0195 ha of forest land for construction of approach road for… — forest land use approved, 3.5 km away
- 4 Lane with Paved shoulder from Darbhanga (Dilli More) to Banwari Patti, (Km.… — more information requested, 3.7 km away
- Diversion of 0.036 Ha of Forest Land for Construction of Approach Road for… — forest land use approved, 3.9 km away
- Bpcl Cgd, Cng/Png Gas Pipeline Project Darbhanga Ga 01 — more information requested, 4.6 km away
- Design Build Construction of Storm Water Drainage Including 1 No. 15 MLD STP. — in-principle approval, conditions pending, 5.1 km away
- Diversion of 0.013875 Ha of Forest Land for Construction of Approach Road for… — more information requested, 5.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.