Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Oct 2026 |
| Application filed | 22 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Dilip Singh |
| Land area | 1.9 acres (0.8 ha) |
| Project cost | ₹8 lakh |
| Village / locality | Maudah Chatur |
| Taluk / tehsil | Patepur |
| District | Vaishali |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02890 |
In context
110 applications in Vaishali since January 2022 are in the same category (Mining): 63 approved, 43 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 38 days from filing to approval. At 1.9 acres, this one is smaller than 85% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Maudah Chatur, Patepur, Vaishali, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- M/S Amresh Bricks Proposed Brick Clay Mining Project at Mauza- Shahbajpur… — under environmental review, 3.1 km away
- Diversion of 0.0165 Hectare of Forest land for construction of approach road… — lapsed, 7.4 km away
- Retail out-let dealership of M/s NX100 PACIFIC BIOFUEL PVT Ltd. Location Mahua… — forest land use approved, 8.6 km away
- M/S Mahima Bricks Proposed Brick Clay Mining Project at Mauza- Patepur, Block-… — initial checks, 8.9 km away
- M/S Rupak Bricks Proposed Brick Clay Mining Project at Mauza- Baligaon… — under environmental review, 10.9 km away
- M/S Tiranga Bricks Proposed Brick Clay Mining Project at Mauza- Mahati… — initial checks, 11 km away
- Proposed Brick Earth Mining for M/S Bhola Bricks - Bishunpur Andra Soil Brick… — environmental approval granted, 11.1 km away
- Proposed Brick Earth Mining for M/S MOTI AND COMPANY - Baligaon Chandpura Soil… — under environmental review, 11.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.