Quick answers
What is this project?
Brick Earth Mining for M/S Royal Int Udyog - Palatpur Soil Brick Mining Project at Mauza+Village- Palatpur, P.O- Katauna, P.S-Katrisarai, District- Nalanda (Bihar) is an approved mining project in Palatpur, Warisaliganj, Nawada, Bihar. The site covers 4.9 acres.
Who is building it?
The applicant is Sachchidanand Kumar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 18 Sept 2026), as of 27 Nov 2026.
Where is it?
In Palatpur, Warisaliganj, Nawada, Bihar.
How big is it?
It has a stated cost of ₹6 lakh and a site of 4.9 acres.
When was it filed?
The application was filed on 20 Aug 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 18 Sept 2026 |
| Application filed | 20 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sachchidanand Kumar |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹6 lakh |
| Village / locality | Palatpur |
| Taluk / tehsil | Warisaliganj |
| District | Nawada |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02897 |
In context
104 applications in Nawada since January 2022 are in the same category (Mining): 82 approved, 17 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 39 days from filing to approval. At 4.9 acres, this one is smaller than 86% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Palatpur, Warisaliganj, Nawada, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Brick Earth Mining for M/S Shan Int Udyog - Katri Soil Brick Mining Project at… — environmental approval granted, 3.9 km away
- Proposed Brick Earth Mining for M/s PINKI INT UDYOG - Dariyapur Soil Brick… — environmental approval granted, 4.2 km away
- Proposed Warsaliganj Cement Grinding Unit with capacity of 2 x 3 MMTPA… — under environmental review, 5.3 km away
- Industrial Area, Warsaliganj — environmental approval granted, 5.3 km away
- Industrial Area, Warsaliganj — environmental approval granted, 5.3 km away
- Industrial Area, Warsaliganj — cleared for impact study, 5.3 km away
- Sand Mining Project, Block- 08 (Dariyapur) Sand Ghat of District- Nawada,… — environmental approval granted, 5.6 km away
- Sand Mining Project, Block- 08 (Dariyapur) Sand Ghat of District- Nawada,… — more information requested, 5.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.