Quick answers
What is this project?
Diversion of 0.01275 Ha of Forest Land for Construction of Approach Road for Opening Retail Outlet of Iocl on Khata No.-206, Khesra No.-343, Thana No.-05, Thana-Simraha, Mauza-Mirzapur to SH-77 Forbesganj-Raniganj Road is a lapsed fuel station in Mirzapur Part I, Forbesganj, Araria, Bihar. The site covers 0.4 acres.
Who is building it?
The applicant is Bimlesh Pasawan.
Has it been approved?
No. The application was lapsed on 29 Jun 2025, so it is no longer under consideration.
Where is it?
In Mirzapur Part I, Forbesganj, Araria, Bihar.
How big is it?
It has a stated cost of ₹80 lakh; a site of 0.4 acres and 130 m² of forest land.
When was it filed?
The application was filed on 6 Sept 2024.
Project details
| Official title | Diversion of 0.01275 Ha of Forest Land for Construction of Approach Road for Opening Retail Outlet of Iocl on Khata No.-206, Khesra No.-343, Thana No.-05, Thana-Simraha, Mauza-Mirzapur to SH-77 Forbesganj-Raniganj Road in Araria District of Bihar. |
|---|---|
| Status | Lapsed |
| Status since | 29 Jun 2025 |
| Application filed | 6 Sept 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Bimlesh Pasawan |
| Land area | 1,700 m² |
| Forest land | 130 m² |
| Project cost | ₹80 lakh |
| Village / locality | Mirzapur Part I |
| Taluk / tehsil | Forbesganj |
| District | Araria |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-03113 |
In context
38 applications in Araria since January 2022 are in the same category (Fuel stations): 10 approved, 16 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 12 months from filing to approval. At 0.4 acres, this one is smaller than 87% of them.
Where it is
Mirzapur Part I, Forbesganj, Araria, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.02475 ha of forest land for construction of approach road for… — forest land use approved, 5.7 km away
- Diversion of 0.02175 ha of forest land for construction of approach road for… — in-principle approval, conditions pending, 6.8 km away
- Diversion of 0.0225 Ha of Forest Land for Construction of Approach Road for… — more information requested, 7.6 km away
- Diversion of 0.02175 Ha of Forest Land for Construction of Approach Road for… — forest land use approved, 7.8 km away
- (1+1)=2 Lane Normal Toll Plaza in Kursela - Kalabarua -Forbesganj (SH-77) road… — under forest review, 8 km away
- Geometric improvement of NH 327E at Bhargama and Sukela More including… — more information requested, 9.6 km away
- Diversion of 0.01875 Ha of Forest Land for Construction of Approach Road for… — lapsed, 10.8 km away
- Diversion of 0.018 Ha of Forest Land for Construction of Approach Road for… — more information requested, 12 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.