Project details
| Status | More information requested |
|---|---|
| Status since | 18 Sept 2025 |
| Application filed | 11 Jun 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Sjvn Thermal Private Limited |
| Land area | 8.6 acres (3.5 ha) |
| Forest land | 4.7 acres (1.9 ha) |
| Project cost | ₹4.8 crore |
| Village / locality | Bechanpurwa |
| Taluk / tehsil | Chausa |
| District | Buxar |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-03164 |
In context
12 applications in Buxar since January 2022 are in the same category (Roads & highways): 1 approved, 8 filed or under review, and 3 withdrawn, lapsed or rejected.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bechanpurwa, Chausa, Buxar, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion from 1320 MW to 1980 MW Buxar Thermal Power Project by… — cleared for impact study, 1 km away
- Proposed Expansion from 1320 MW to 1980 MW Buxar Thermal Power Project by… — cleared for impact study, 1 km away
- ROB with approach viaduct in Chausa-Gahmar Railway Section at KM 673/7-8 LC… — more information requested, 2.5 km away
- Improvement/Upgradation, Widening & Strengthening of… — more information requested, 2.6 km away
- Diversion of 0.03375 Ha of Forest Land for Construction of Approach Road for… — lapsed, 4.7 km away
- Diversion of 0.0135 Ha of Forest Land for Construction of Approach Road for… — forest land use approved, 4.7 km away
- SJVN Thermal (Pvt.) Limited, Buxar Thermal Power Project — more information requested, 5.3 km away
- Proposed Brick Earth Mining for M/S GYANTI INT UDYOG – Dhudhani Soil Brick… — environmental approval granted, 6.8 km away
More from Sjvn Thermal Private Limited in Buxar
- SJVN Thermal (Pvt.) Limited, Buxar Thermal Power Project — more information requested
- Proposed Expansion from 1320 MW to 1980 MW Buxar Thermal Power Project by… — cleared for impact study
All 4 Sjvn Thermal projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.