Quick answers
What is this project?
Transfer of surplus flood water from the Ganga River to the Badua and Kharagpur reservoirs (Badua and Kharagpur Lift Irrigation Schemes) is a proposed pipeline project in Kaujhi, Asarganj, Munger, Bihar. The site covers 179.4 acres.
Who is building it?
The applicant is Executive Engineer, Irrigation Division, Jhajha.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Kaujhi, Asarganj, Munger, Bihar.
How big is it?
It has a stated cost of ₹18.7 crore; a site of 179.4 acres and 7.3 acres (3 ha) of forest land.
When was it filed?
The application was filed on 21 Sept 2026.
Project details
| Official title | Transfer of surplus flood water from the Ganga River to the Badua and Kharagpur reservoirs (Badua and Kharagpur Lift Irrigation Schemes) under the Irrigation Division, Tarapur (Department of Water Resources, Government of Bihar). The project covers the Bhagalpur, Munger, and Banka districts of Bihar. |
|---|---|
| Status | More information requested |
| Status since | 30 Oct 2026 |
| Application filed | 21 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Executive Engineer, Irrigation Division, Jhajha |
| Land area | 179.4 acres (72.6 ha) |
| Forest land | 7.3 acres (3 ha) |
| Project cost | ₹18.7 crore |
| Village / locality | Kaujhi |
| Taluk / tehsil | Asarganj |
| District | Munger |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-03216 |
In context
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kaujhi, Asarganj, Munger, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Retail out-let dealership of M/s Bharat Petroleum Corporation Ltd. Location… — forest land use approved, 3.5 km away
- Retail out-let dealership of M/s Hindustan Petroleum Corporation Ltd. Location… — forest land use approved, 4.7 km away
- Proposed Brick Earth Mining for M/S Kumar Bricks Udyog- Meenapur Soil Brick… — environmental approval granted, 5.5 km away
- Sand Mining Project of Sahora balu ghat of Area 5.58 Ha on Badua River of… — environmental approval granted, 6.2 km away
- Sand Mining Project of Sahora balu ghat of Area 5.58 Ha on Badua River of… — cleared for impact study, 6.2 km away
- Detailed Project Report for Widening and Strengthening from Intermediate Lane… — more information requested, 6.7 km away
- Retail out-let dealership of M/s Indian Oil Corporation Ltd. Location Within 2… — forest land use approved, 6.7 km away
- Brick Earth Mining for M/S MBC Bricks- Nonaji Soil Brick Mining Project at… — environmental approval granted, 9.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.