Project details
| Official title | Diversion of 0.0225 Ha of Forest Land for Construction of Approach Road for Opening Retail Outlet of Iocl on NH-101 Mohamadpur-Malmaliya-Chhapra Road in Siwan District of Bihar. |
|---|---|
| Status | Forest land use approved |
| Status since | 11 Mar 2026 |
| Application filed | 10 Dec 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Anupam Kumar |
| Land area | 2,300 m² |
| Forest land | 230 m² |
| Project cost | ₹60 lakh |
| Village / locality | Rampur Khas |
| Taluk / tehsil | Bhagwanpur Hat |
| District | Siwan |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-03293 |
In context
8 applications in Siwan since January 2022 are in the same category (Fuel stations): 7 approved, 1 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 14 months from filing to approval.
Where it is
Rampur Khas, Bhagwanpur Hat, Siwan, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.0375 Ha of Forest Land for Construction of Approach Road for… — forest land use approved, 6.6 km away
- M/s Sonu Int Udyog Proposed Brick Clay Mining Project at Mauza- Sarahari,… — environmental approval granted, 9.1 km away
- M/s PNT Bricks Udyog Proposed Brick Clay Mining Project at Mauza, Rishaura… — environmental approval granted, 13.3 km away
- Siwan Mashrakh Section of NH 227a From Km 0+000 to Km 45.906 — lapsed, 14.7 km away
- Proposed Brick Clay Mining Project of M/s- Maa Int Udyog at Mauza- Chhitauli… — environmental approval granted, 15.2 km away
- Construction and Upgradation of Four Lane from Siwan (Design Ch. 4 217) to… — more information requested, 15.4 km away
- Diversion of 0.014425 Ha of Forest Land for Construction of Approach Road for… — forest land use approved, 17.9 km away
- Mamta Medical College and Hospital (A Project of Ambedkar Institute of Higher… — environmental approval granted, 20.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.