Quick answers
What is this project?
Road From NH-31 Piprakhurd Road to Mahimabigha 0.550 Km From Chainage. 0.00 to 200 M Forest Land Falls Area. Hence 0.2 Ha Forest Land Required is a lapsed road project in Mahiman Bigaha, Akbarpur, Nawada, Bihar. The site covers 0.5 acres.
Who is building it?
The applicant is Executive Engineer Rwd Works Division Rajauli.
Has it been approved?
No. The application was lapsed on 22 Sept 2025, so it is no longer under consideration.
Where is it?
In Mahiman Bigaha, Akbarpur, Nawada, Bihar.
How big is it?
It has a stated cost of ₹35 lakh; a site of 0.5 acres and 2,000 m² of forest land.
When was it filed?
The application was filed on 30 Nov 2023.
Project details
| Official title | Construction of Road From NH-31 Piprakhurd Road to Mahimabigha 0.550 Km From Chainage. 0.00 to 200 M Forest Land Falls Area. Hence 0.2 Ha Forest Land Required. |
|---|---|
| Status | Lapsed |
| Status since | 22 Sept 2025 |
| Application filed | 30 Nov 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer Rwd Works Division Rajauli |
| Land area | 2,000 m² |
| Forest land | 2,000 m² |
| Project cost | ₹35 lakh |
| Village / locality | Mahiman Bigaha |
| Taluk / tehsil | Akbarpur |
| District | Nawada |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-03308 |
In context
13 applications in Nawada since January 2022 are in the same category (Roads & highways): 0 approved, 5 filed or under review, and 8 withdrawn, lapsed or rejected. At 0.5 acres, this one is smaller than 100% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mahiman Bigaha, Akbarpur, Nawada, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Mining Project, Block- 06 (Nad sand ghat & Bilaspur Sand Ghat) of… — environmental approval granted, 1.5 km away
- Sand Mining Project, Block- 06 (Nad sand ghat & Bilaspur Sand Ghat) of… — cleared for impact study, 1.5 km away
- Proposed Brick Earth Mining for M/S KAKA BRICKS WORKS - Manebigha Soil Brick… — environmental approval granted, 3 km away
- Khakhandua Stone Mine — environmental approval granted, 5 km away
- Khakhandua Stone Mine — under environmental review, 5 km away
- Sand Mining Project, Block- 05 (Malikpur sand ghat - 03) — environmental approval granted, 5.1 km away
- Sand Mining Project, Block- 05 (Malikpur sand ghat - 03) — cleared for impact study, 5.1 km away
- Khakhandua Stone Deposit, Block- B — environmental approval granted, 5.3 km away
More from Executive Engineer Rwd Works Division Rajauli in Nawada
- Forest Clearance for construction of Primary School Khirkiyatari to Dhararva… — more information requested
- Forest Clearance for construction of Primary School Khirkiyatari to Dhararva… — lapsed
- Forest Clearance for construction of Chordiha to Nawadih Kosdariya All-weather… — lapsed
- Forest clearance for construction of Karpurinagar Path to Nalapar Ravidas Tola… — lapsed
- Forest Clearance for construction of Khakhandua to Obhaiyya All-weather Road… — lapsed
- Road From Khatangi Path to Lawni 5.3 Km Total Length of This Road. Hence 5.3… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.