Project details
| Official title | Diversion of 0.009 Ha of Forest Land for Construction of Approach Road for Opening Retail Outlet of Iocl on Vidyapat Nagar-Bajrang Chowk Road in Samastipur District of Bihar. |
|---|---|
| Status | Forest land use approved |
| Status since | 28 Jan 2025 |
| Application filed | 7 Aug 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Govind Jaiswal |
| Land area | 1,600 m² |
| Forest land | 90 m² |
| Project cost | ₹60 lakh |
| Village / locality | Sahit |
| Taluk / tehsil | Vidyapati Nagar |
| District | Samastipur |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-03512 |
In context
23 applications in Samastipur since January 2022 are in the same category (Fuel stations): 11 approved, 9 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 0.4 acres, this one is smaller than 91% of them.
Where it is
Sahit, Vidyapati Nagar, Samastipur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.0225 Ha of Forest Land for Construction of Approach Road for… — forest land use approved, 7.5 km away
- Retail out-let dealership of M/s Indian Oil Corporation Ltd. Location Within 5… — more information requested, 8 km away
- ROB & its approaches in Dalsinghsarai Yard at Railway Chainage KM 11/23-23A,… — more information requested, 9.2 km away
- Diversion of 0.00825 ha of forest land for construction of approach road for… — forest land use approved, 11.1 km away
- Proposed Brick clay mining project by M/S RK & VK Bricks — under environmental review, 12.6 km away
- Proposed Brick Earth Mining Project for M/S Kundan Int Udyog at Mauza-… — environmental approval granted, 13 km away
- Brick Earth Mining For M/S Sidhi Vinayak Bricks Industries - Ahamadpur Soil… — environmental approval granted, 14.2 km away
- Proposed Brick Earth Mining for M/S Shristi Bricks- Jitwarpur Muskara Soil… — environmental approval granted, 14.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.