Diversion of 0.0375 Ha of Forest Land for Construction of Approach Road for Opening Retail Outlet of Nx100 Pacific Biofuel PVT. LTD. on NH-83 Gaya-Patna Road is a lapsed fuel station in Or, Belaganj, Gaya, Bihar. The site covers 1 acre.
Who is building it?
The applicant is Kundan Kumar.
Has it been approved?
No. The application was lapsed on 17 Jun 2025, so it is no longer under consideration.
Where is it?
In Or, Belaganj, Gaya, Bihar.
How big is it?
It has a stated cost of ₹60 lakh; a site of 1 acre and 380 m² of forest land.
When was it filed?
The application was filed on 18 Oct 2023.
Project details
| Official title | Diversion of 0.0375 Ha of Forest Land for Construction of Approach Road for Opening Retail Outlet of Nx100 Pacific Biofuel PVT. LTD. on NH-83 Gaya-Patna Road in Gaya District of Bihar. |
|---|---|
| Status | Lapsed |
| Status since | 17 Jun 2025 |
| Application filed | 18 Oct 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Kundan Kumar |
| Land area | 4,000 m² |
| Forest land | 380 m² |
| Project cost | ₹60 lakh |
| Village / locality | Or |
| Taluk / tehsil | Belaganj |
| District | Gaya |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-03531 |
In context
21 applications in Gaya since January 2022 are in the same category (Fuel stations): 5 approved, 6 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 22 months from filing to approval. At 1 acre, this one is larger than 90% of them.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Or, Belaganj, Gaya, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Brick Earth Mining for M/S Sun Int Udyog-Kamalpur Soil Brick Mining Project — environmental approval granted, 2 km away
- Proposed Brick Earth Mining for M/S M K Bricks - Beldar Bigha Soil Brick… — environmental approval granted, 2.7 km away
- Brick Earth Mining for M/S M K Bricks - Beldar Bigha Soil Brick Mining Project… — withdrawn, 2.7 km away
- Brick Earth Mining for M/S Baba Bricks - Risaudh Soil Brick Mining Project… — environmental approval granted, 2.9 km away
- Environmental Clearance of soil mining project for Bricks of M/s GS Bricks,… — environmental approval granted, 3 km away
- Proposed Brick Earth Mining Project of M/s A K Bricks Udyog at Mauza -… — environmental approval granted, 3.1 km away
- Proposed Brick Earth Mining Project of M/s Pradan Bricks at Mauza -… — environmental approval granted, 3.3 km away
- Brick Earth Mining For M/S Trishul Int Udyog-Khilafatpur Soil Brick Mining… — environmental approval granted, 4.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.