Quick answers
What is this project?
Diversion of 0.015 Ha of Forest Land for Construction of Approach Road for Opening Retail Outlet of Iocl on Mauza-Dakshin Maheshwari to Jogbani-Mirganj Pwd Road is an approved fuel station in Maheshri Dakhinwari, Forbesganj, Araria, Bihar. The site covers 0.4 acres.
Who is building it?
The applicant is Seema Rani.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 4 May 2026), as of 27 Nov 2026.
Where is it?
In Maheshri Dakhinwari, Forbesganj, Araria, Bihar.
How big is it?
It has a stated cost of ₹80 lakh; a site of 0.4 acres and 150 m² of forest land.
When was it filed?
The application was filed on 23 Apr 2025.
Project details
| Official title | Diversion of 0.015 Ha of Forest Land for Construction of Approach Road for Opening Retail Outlet of Iocl on Mauza-Dakshin Maheshwari to Jogbani-Mirganj Pwd Road in Araria District of Bihar. |
|---|---|
| Status | Forest land use approved |
| Status since | 4 May 2026 |
| Application filed | 23 Apr 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Seema Rani |
| Land area | 1,600 m² |
| Forest land | 150 m² |
| Project cost | ₹80 lakh |
| Village / locality | Maheshri Dakhinwari |
| Taluk / tehsil | Forbesganj |
| District | Araria |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-03551 |
In context
38 applications in Araria since January 2022 are in the same category (Fuel stations): 10 approved, 16 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 12 months from filing to approval. At 0.4 acres, this one is smaller than 92% of them.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Maheshri Dakhinwari, Forbesganj, Araria, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Brick clay mining project at Mauja- Bhatiyahi, P.O.- Bathnaha, P.S.-… — environmental approval granted, 3 km away
- Proposed brick clay mining project of M/s G.G Construction at Mauza-… — environmental approval granted, 3.1 km away
- Environmental Clearance of soil mining project for Bricks M/s Star Bricks… — environmental approval granted, 3.2 km away
- Diversion of 0.030 Ha of Forest Land for Construction of Approach Road for… — lapsed, 3.3 km away
- Proposed Brick Clay Mining Project of M/s Hanuman Bricks Manufacturer at Mauza… — environmental approval granted, 3.3 km away
- Diversion of 0.0285 ha of forest land for construction of approach road for… — forest land use approved, 3.4 km away
- Proposed Brick Clay Mining Project of M/s Channi Bricks at Mauza - Bhatiyahi,… — environmental approval granted, 3.4 km away
- Brick Earth mining project of M/s VIP Brick Company at Mauja- Bhatiyahi,… — environmental approval granted, 3.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.