Quick answers
What is this project?
Widening & Improvement of Ara Town Road From Estern ROB (Bus Stand) to Western ROB Via Railway Station and Link Road from Station More to Club More (Judge kothi Mor) Via KG Road, S.P. Residence, Krishi Bhawan, Block office for the year 2024-25 is a proposed road project in Arrah, Bhojpur, Bihar. The site covers 8.4 acres.
Who is building it?
The applicant is Executive Engineer.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Arrah, Bhojpur, Bihar.
How big is it?
It has a stated cost of ₹14.1 crore; a site of 8.4 acres and 2,480 m² of forest land.
When was it filed?
The application was filed on 10 Feb 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 9 Nov 2026 |
| Application filed | 10 Feb 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer |
| Land area | 8.4 acres (3.4 ha) |
| Forest land | 2,480 m² |
| Project cost | ₹14.1 crore |
| Village / locality | Arrah |
| Taluk / tehsil | Arrah |
| District | Bhojpur |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-03629 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 10 Feb 2026 (this page) | More information requested | 8.4 acres | ₹14.1 crore |
| New project filed 26 May 2025 | Lapsed | 8.4 acres | ₹14.1 crore |
In context
17 applications in Bhojpur since January 2022 are in the same category (Roads & highways): 0 approved, 9 filed or under review, and 8 withdrawn, lapsed or rejected. At 8.4 acres, this one is smaller than 53% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Arrah, Bhojpur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Widening & Improvement of Ara Town Road From Estern ROB (Bus Stand) to Western… — lapsed, 0 m away
- AGRICULTURAL ENGINEERING COLLEGE (Project of Bihar Agriculture University,… — environmental approval granted, 1 km away
- Widening & Improvement to Four Lane From Bampali to Girija More , Two Lane… — more information requested, 2.6 km away
- Widening & Improvement to Four Lane From Bampali to Girija More , Two Lane… — lapsed, 2.6 km away
- Widening & Improvement to Two Lane with Paved Shoulder from Aryanaya Devi… — more information requested, 2.9 km away
- Widening & Improvement to Two Lane with Paved Shoulder from Aryanaya Devi… — lapsed, 2.9 km away
- Diversion of 0.0135 Ha of Forest Land for Construction of Approach Road for… — lapsed, 3.5 km away
- Widening and Improvement to Four Lane From Zero Mile to Patar(Left Out of… — more information requested, 4 km away
More from Executive Engineer in Bhojpur
- Construction of Toll Plaza in Ara Sasaram Road 16th Km — under forest review
- Widening and Strengthening of Kurmuri on SH 102 to Bandhwa Road From Single… — more information requested
- Proposed by Pass Road From Ojhwaliya Pul on Bihiya-Jagdishpur-Piro-Sikarhatta-B… — more information requested
- Widening and Improvement to Four Lane From Zero Mile to Patar(Left Out of… — more information requested
- Widening & Improvement to Four Lane of the Junction Road (NH84 Left Out) of… — more information requested
- Widening & Improvement to Four Lane From Bampali to Girija More , Two Lane… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.