Quick answers
What is this project?
Diversion of 0.0128 ha of forest land for construction of approach road for opening retail outlet of M/s NX100 Pacific Biofuel Pvt. Ltd. on Khata No.-18 and 107, Khesra/Plot No.-59 and 1817, Thana No.-179, Thana-Tarabari, Anchal-Araria, Mauza-Dabhara Jagir to Kursakanta to Araria Road, District-Araria district of Bihar is a proposed fuel station in Dabhra, Araria, Bihar. The site covers 0.5 acres.
Who is building it?
The applicant is Jyoti kumari.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Dabhra, Araria, Bihar.
How big is it?
It has a stated cost of ₹80 lakh; a site of 0.5 acres and 130 m² of forest land.
When was it filed?
The application was filed on 6 Jan 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 8 Oct 2026 |
| Application filed | 6 Jan 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Jyoti kumari |
| Land area | 2,000 m² |
| Forest land | 130 m² |
| Project cost | ₹80 lakh |
| Village / locality | Dabhra |
| Taluk / tehsil | Araria |
| District | Araria |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-03643 |
In context
38 applications in Araria since January 2022 are in the same category (Fuel stations): 10 approved, 16 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 12 months from filing to approval. At 0.5 acres, this one is smaller than 68% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dabhra, Araria, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Forest Clearance for Widening and Strengthening (Intermediate Lane to Two Lane… — more information requested, 4.4 km away
- Forest Clearance for Widening and Strengthening (Intermediate Lane to Two Lane… — under forest review, 4.4 km away
- Diversion of 0.012375 Ha of Forest Land for Construction of Approach Road for… — lapsed, 4.5 km away
- Diversion of 0.0135 Ha of Forest Land for Construction of Approach Road for… — more information requested, 6.2 km away
- Mining project by M/s ABID Bricks (NMC)Address Mauza-Kursakanta,… — lapsed, 6.6 km away
- Regarding Environmental Clearance of soil mining project for Bricks fM/s New… — environmental approval granted, 6.9 km away
- Proposed Brick earth mining project at Mauja- Dedhua, Block: Sikti, District-… — lapsed, 6.9 km away
- Environmental Clearance of soil mining project for Bricks ofM/s Bihar… — environmental approval granted, 7.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.