Quick answers
What is this project?
Conversion of OFF Grid connection to ON Grid connection from Bhimbandh to Chormara and other (Jamui) is a lapsed project in Gurmha, Barhat, Jamui, Bihar. The site covers 73.7 acres.
Who is building it?
The applicant is South Bihar Power Distribution Company Limited.
Has it been approved?
No. The application was lapsed on 10 Apr 2025, so it is no longer under consideration.
Where is it?
In Gurmha, Barhat, Jamui, Bihar.
How big is it?
It has a stated cost of ₹2.2 crore; a site of 73.7 acres and 30 m² of forest land.
When was it filed?
The application was filed on 13 Mar 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Conversion of OFF Grid connection to ON Grid connection from Bhimbandh to Chormara and…
Project details
| Status | Lapsed |
|---|---|
| Status since | 10 Apr 2025 |
| Application filed | 13 Mar 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | South Bihar Power Distribution Company Limited |
| Land area | 73.7 acres (29.8 ha) |
| Forest land | 30 m² |
| Project cost | ₹2.2 crore |
| Village / locality | Gurmha |
| Taluk / tehsil | Barhat |
| District | Jamui |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-03694 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 13 Mar 2024 (this page) | Lapsed | 73.7 acres | ₹2.2 crore |
| New project filed 7 Mar 2024 | Under wildlife review | 73.7 acres | ₹2.2 crore |
In context
21 applications in Jamui since January 2022 are in the same category (Other): 0 approved, 8 filed or under review, and 13 withdrawn, lapsed or rejected. At 73.7 acres, this one is larger than 67% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gurmha, Barhat, Jamui, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Conversion of OFF Grid connection to ON Grid connection from Bhimbandh to… — lapsed, 0 m away
- Conversion of OFF Grid connection to ON Grid connection from Bhimbandh to… — lapsed, 0 m away
- Conversion of OFF Grid connection to ON Grid connection from Bhimbandh to… — under wildlife review, 0 m away
- Bihar Aspirational Project RPT TOLA BHORBHANDARI — lapsed, 850 m away
- Bihar Aspirational Project RPT TOLA BHORBHANDARI — more information requested, 850 m away
- Bihar Aspirational Project RPT GURMAHA — lapsed, 1.5 km away
- Bihar Aspirational Project RPT GURMAHA — more information requested, 1.5 km away
- Widening & Strengthening of Chormara-Sava Lakh Baba (Chormara to Bhimbandh)… — under wildlife review, 2.2 km away
More from South Bihar Power Distribution Company Limited in Jamui
- Grid Connectivity to Vilages of Barhat and Laxmipur Block of Jamui District — under wildlife review
- Grid Connectivity to vilages of Barhat, Chakai, Jhajha, Laxmipur and Sono… — under forest review
- Grid Connectivity to vilages of Barhat, Chakai, Jhajha, Laxmipur and Sono… — application filed
- DDG- conversion of OFF Grid connection to ON Grid connection at Paisra,… — more information requested
- DDG- conversion of OFF Grid connection to ON Grid connection at Paisra,… — lapsed
- DDG- conversion of OFF Grid connection to ON Grid connection — lapsed
10 South Bihar Power projects in Jamui
All 32 South Bihar Power projects across India