Project details
| Status | In-principle approval, conditions pending |
|---|---|
| Status since | 21 Nov 2026 |
| Application filed | 7 Apr 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer Road Construction Department Road Division Buxar |
| Forest land | 7.2 acres (2.9 ha) |
| Project cost | ₹38.4 crore |
| Village / locality | Buxar |
| Taluk / tehsil | Buxar |
| District | Buxar |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-03708 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 7 Apr 2026 (this page) | In-principle approval, conditions pending | ₹38.4 crore | |
| New project filed 31 May 2025 | Lapsed | ₹38.4 crore |
In context
12 applications in Buxar since January 2022 are in the same category (Roads & highways): 1 approved, 8 filed or under review, and 3 withdrawn, lapsed or rejected.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Buxar, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Widening & Strengthening work of Buxar Golamber to Jyoti Chowk (Four Lane)… — lapsed, 0 m away
- ROB approach span of viaduct at Buxar-Baruna Railway Station at L.C No. 70/A… — more information requested, 650 m away
- Widening Work of Rcd Road From Badi Maszid to Central Jail (Total Length 4.20… — more information requested, 2.3 km away
- Widening Work of Rcd Road From Badi Maszid to Central Jail (Total Length 4.20… — lapsed, 2.3 km away
- Proposed Brick Earth Mining for M/S Sun Ent Udyog- Nadaon Soil Brick Mining… — environmental approval granted, 3.6 km away
- Proposed Brick Earth Mining Project for M/S Shiv Int Udyog at Mauza/Vill-… — environmental approval granted, 4.2 km away
- Brick Earth Mining for M/S Sun Bricks - Churamanpur Soil Brick Mining Project… — environmental approval granted, 5.4 km away
- Proposed Brick Earth Mining for M/S D.K BRICKS – Parari Soil Brick Mining… — environmental approval granted, 6 km away
More from Executive Engineer Road Construction Department Road Division Buxar in Buxar
- Toll Plaza in Chausa gola- Kochas Road (Ch. 49+800) SH 17 at location saitapur — under forest review
- Widening Work of Rcd Road From Badi Maszid to Central Jail (Total Length 4.20… — more information requested
- Widening & Strengthening of Bhojpur Simri Road (from KM 0.00 to KM 9.30),… — more information requested
- Widening & Strengthening of Bhojpur Simri Road (from KM 0.00 to KM 9.30),… — lapsed
- Widening Work of Rcd Road From Badi Maszid to Central Jail (Total Length 4.20… — lapsed