Quick answers
What is this project?
132 KV DCSS LINE FOR CONNECTIVITY OF SOLAR PLANT BY M/s ACSEPL TO 132/33 KV BSPTCL GSS BANKA (NEW) is a proposed power project in Kakwara Tola Paharidih, Banka, Bihar. The site covers 1,438.5 acres.
Who is building it?
The applicant is Avaada Clean Sustainable Energy Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Kakwara Tola Paharidih, Banka, Bihar.
How big is it?
It has a stated cost of ₹3.3 crore; a site of 1,438.5 acres and 2.5 acres (1 ha) of forest land.
When was it filed?
The application was filed on 26 Jul 2023.
Project details
| Status | More information requested |
|---|---|
| Status since | 6 May 2024 |
| Application filed | 26 Jul 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Avaada Clean Sustainable Energy Private Limited |
| Land area | 1,438.5 acres (582.2 ha) |
| Forest land | 2.5 acres (1 ha) |
| Project cost | ₹3.3 crore |
| Village / locality | Kakwara Tola Paharidih |
| Taluk / tehsil | Banka |
| District | Banka |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-03732 |
In context
5 applications in Banka since January 2022 are in the same category (Power): 0 approved, 4 filed or under review, and 1 withdrawn, lapsed or rejected.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kakwara Tola Paharidih, Banka, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.036 Ha of Forest Land for Construction of Approach Road for… — forest land use approved, 1.7 km away
- Diversion of 0.03975 ha of forest land for construction of approach road for… — more information requested, 2.1 km away
- Proposed Sand Mining Project of Area 33 Ha at Chanan Block -09 on Chanan River… — environmental approval granted, 4.2 km away
- Proposed Sand Mining Project of Area 33 Ha at Chanan Block -09 on Chanan River… — returned to applicant, 4.2 km away
- Proposed Sand Mining Project of Area 33 Ha at Chanan Block -09 on Chanan River… — cleared for impact study, 4.2 km away
- Proposed Sand Mining Project of Area 22 Ha at Chanan Block -08 on Chanan River… — under environmental review, 4.7 km away
- Proposed Sand Mining Project of Area 22 Ha at Chanan Block -08 on Chanan River… — cleared for impact study, 4.7 km away
- Sand Mining Project, Kurar Unit (Block-1, Block-2 & Block-3) Sand Ghat (Area-… — lapsed, 5.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.