Diversion of 0.03975 Ha of Forest Land for Construction of Approach Road for Opening Retail Outlet of Hpcl on Araria-Purnea Road

Diversion of 0.03975 Ha of Forest Land for Construction of Approach Road for Opening Retail Outlet of Hpcl on Araria-Purnea Road is a lapsed fuel station in Rampur Kudarkatti, Araria, Bihar. The site covers 1.1 acres. Its stated project cost is ₹60 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 26 Apr 2025).

See it on the live map All projects in Araria

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of 0.03975 Ha of Forest Land for Construction of Approach Road for Opening Retail Outlet of Hpcl on Araria-Purnea Road is a lapsed fuel station in Rampur Kudarkatti, Araria, Bihar. The site covers 1.1 acres.

Who is building it?

The applicant is Jitendra Kumar.

Has it been approved?

No. The application was lapsed on 26 Apr 2025, so it is no longer under consideration.

Where is it?

In Rampur Kudarkatti, Araria, Bihar.

How big is it?

It has a stated cost of ₹60 lakh; a site of 1.1 acres and 400 m² of forest land.

When was it filed?

The application was filed on 8 Jun 2023.

Project details

Official titleDiversion of 0.03975 Ha of Forest Land for Construction of Approach Road for Opening Retail Outlet of Hpcl on Araria-Purnea Road in Araria District of Bihar.
StatusLapsed
Status since26 Apr 2025
Application filed8 Jun 2023
Approval soughtForest land use
Application typeNew project
SectorFuel stations
ApplicantJitendra Kumar
Land area1.1 acres (0.5 ha)
Forest land400 m²
Project cost₹60 lakh
Village / localityRampur Kudarkatti
Taluk / tehsilAraria
DistrictAraria
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-03739

In context

38 applications in Araria since January 2022 are in the same category (Fuel stations): 10 approved, 16 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 12 months from filing to approval. At 1.1 acres, this one is larger than 87% of them.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Rampur Kudarkatti, Araria, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.