LapsedRoads & highways · Gaya, Bihar

Forest Clearance Proposal for Widening of "banaganga(Nh-82)(Design Chainage 5+450 to Km 13+900) - Jethian-Gehlour-Bindus(Nh-82), (Design Chainage Km 13+900 to Km 41+900)package- 1, Total Length of the Road Under Forest Clearance Is 36.45 Km" to Two Lane Configuration

Forest Clearance Proposal for Widening of "banaganga(Nh-82)(Design Chainage 5+450 to Km 13+900) - Jethian-Gehlour-Bindus(Nh-82), (Design Chainage Km 13+900 to Km 41+900)package- 1, Total Length of the Road Under Forest Clearance Is 36.45 Km" to Two Lane Configuration is a lapsed road project in Aer, Muhra, Gaya, Bihar. The site covers 180.4 acres. Its stated project cost is ₹349.4 crore. As of 27 Nov 2026, its status is “Lapsed” (since 6 Nov 2026).

See it on the live map All projects in Gaya

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Forest Clearance Proposal for Widening of "banaganga(Nh-82)(Design Chainage 5+450 to Km 13+900) - Jethian-Gehlour-Bindus(Nh-82), (Design Chainage Km 13+900 to Km 41+900)package- 1, Total Length of the Road Under Forest Clearance Is 36.45 Km" to Two Lane Configuration is a lapsed road project in Aer, Muhra, Gaya, Bihar. The site covers 180.4 acres.

Who is building it?

The applicant is Bihar State Road Development Corporation Limited.

Has it been approved?

No. The application was lapsed on 6 Nov 2026, so it is no longer under consideration.

Where is it?

In Aer, Muhra, Gaya, Bihar.

How big is it?

It has a stated cost of ₹349.4 crore; a site of 180.4 acres and 126.1 acres (51 ha) of forest land.

When was it filed?

The application was filed on 23 Jan 2025.

Project details

StatusLapsed
Status since6 Nov 2026
Application filed23 Jan 2025
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantBihar State Road Development Corporation Limited
Land area180.4 acres (73 ha)
Forest land126.1 acres (51 ha)
Project cost₹349.4 crore
Village / localityAer
Taluk / tehsilMuhra
DistrictGaya
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-03769

In context

34 applications in Gaya since January 2022 are in the same category (Roads & highways): 0 approved, 25 filed or under review, and 9 withdrawn, lapsed or rejected. At 180.4 acres, this one is larger than 93% of them.

4 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Aer, Muhra, Gaya, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Bihar State Road Development Corporation Limited in Gaya

All 34 Bihar State Road Development Corporation projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.