Quick answers
What is this project?
2-Lane Elevated Corridor from Madanpur to Paniyahwa (Bihar-U.P. Border) from Chainage Km 102-110 of NH 727 in the State of Bihar is a proposed project in Belahwa Madanpur G.P., Sidhaw, Pashchim Champaran, Bihar.
Who is building it?
The applicant is Executive Engineer NH Division Motihari.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Belahwa Madanpur G.P., Sidhaw, Pashchim Champaran, Bihar.
How big is it?
It has a stated cost of ₹600 crore.
When was it filed?
The application was filed on 17 Sept 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 4 Nov 2026 |
| Application filed | 17 Sept 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Other |
| Applicant | Executive Engineer NH Division Motihari |
| Project cost | ₹600 crore |
| Village / locality | Belahwa Madanpur G.P. |
| Taluk / tehsil | Sidhaw |
| District | Pashchim Champaran |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-03964 |
In context
32 applications in Pashchim Champaran since January 2022 are in the same category (Other): 0 approved, 32 filed or under review, and 0 withdrawn, lapsed or rejected.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Belahwa Madanpur G.P., Sidhaw, Pashchim Champaran, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Short Term maintenance Contract (STMC) work only worthy maintenance work (Non… — under wildlife review, 50 m away
- Short Term maintenance Contract (STMC) work only worthy maintenance work (Non… — lapsed, 50 m away
- Doubling of Gorakhpur Cantt-Valmikinagar Single line section — more information requested, 1.4 km away
- Proposed Wildlife Proposal of forest land to be diverted for doubling of… — lapsed, 1.5 km away
- Proposed Wildlife Proposal of forest land to be diverted for doubling of… — more information requested, 1.5 km away
- Proposed Brick Earth Mining for M/S Mata Rani Int Udyog Sabeya Musai Soil… — not approved, 9 km away
- Proposed Brick Earth Mining for M/S New Namrata Int Udyog Sabeya Musai Soil… — not approved, 9.6 km away
- Proposed Brick Earth Mining Project for M/S Trishul Int Udyog at Mauza: Goiti… — initial checks, 13 km away
More from Executive Engineer NH Division Motihari in Pashchim Champaran
- Short Term maintenance Contract (STMC) work only worthy maintenance work (Non… — under wildlife review
- Short Term maintenance Contract (STMC) work only worthy maintenance work (Non… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.