What is Developing? Open the mapMap

Environmental approval grantedMining · Bhojpur, Bihar

Proposed Sand Mining Project "BHOJ SON- 22B" sand ghat on Sone river at Mauza- Kirkiri, Block- Agiaon, Distt.- Bhojpur, Bihar (Area-23.0Ha.), capacity: 414000 cum per annum

Proposed Sand Mining Project "BHOJ SON- 22B" sand ghat on Sone river at Mauza- Kirkiri, Block- Agiaon, Distt.- Bhojpur, Bihar (Area-23.0Ha.), capacity: 414000 cum per annum is an approved mining project in Kirkiri, Agiaon, Bhojpur, Bihar. The site covers 56.8 acres. Its stated project cost is ₹8.2 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 5 Nov 2026).

See it on the live map All projects in Bhojpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Sand Mining Project "BHOJ SON- 22B" sand ghat on Sone river at Mauza- Kirkiri, Block- Agiaon, Distt.- Bhojpur, Bihar (Area-23.0Ha.), capacity: 414000 cum per annum is an approved mining project in Kirkiri, Agiaon, Bhojpur, Bihar. The site covers 56.8 acres.

Who is building it?

The applicant is Ratan Gupta.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 5 Nov 2026), as of 27 Nov 2026.

Where is it?

In Kirkiri, Agiaon, Bhojpur, Bihar.

How big is it?

It has a stated cost of ₹8.2 crore and a site of 56.8 acres.

When was it filed?

The application was filed on 29 Oct 2026.

Project details

StatusEnvironmental approval granted
Status since5 Nov 2026
Application filed29 Oct 2026
Approval soughtEnvironmental approval
Application typeOwnership transfer
SectorMining
ApplicantRatan Gupta
Land area56.8 acres (23 ha)
Project cost₹8.2 crore
Village / localityKirkiri
Taluk / tehsilAgiaon
DistrictBhojpur
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-03991

In context

142 applications in Bhojpur since January 2022 are in the same category (Mining): 133 approved, 5 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 28 days from filing to approval. At 56.8 acres, this one is smaller than 76% of them.

4 other mining leases have applied within 500 m of this site; together with this one they cover 286.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 12 mining leases have applied within 5 km.

Where it is

Kirkiri, Agiaon, Bhojpur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.