Quick answers
What is this project?
Proposed Brick Earth Mining for M/S TVS Int Udyog – Itwan/Chandi Soil Brick Mining Project at Mauza/Village- Itwan (Thana No 31)/Chandi (Thana No 28), PO- Irwan, P.S+Block – Haspura, District Aurangabad (Bihar) is a proposed mining project in Chandi, Haspura, Aurangabad, Bihar. The site covers 7.6 acres.
Who is building it?
The applicant is Shree Niwash Singh.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Chandi, Haspura, Aurangabad, Bihar.
How big is it?
It has a stated cost of ₹7 lakh and a site of 7.6 acres.
When was it filed?
The application was filed on 6 Nov 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 21 Nov 2026 |
| Application filed | 6 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shree Niwash Singh |
| Land area | 7.6 acres (3.1 ha) |
| Project cost | ₹7 lakh |
| Village / locality | Chandi |
| Taluk / tehsil | Haspura |
| District | Aurangabad |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-04012 |
In context
145 applications in Aurangabad since January 2022 are in the same category (Mining): 127 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 7.6 acres, this one is smaller than 83% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Chandi, Haspura, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Brick Earth Mining Project of M/s. Baba Int Udyog — environmental approval granted, 3.2 km away
- Brick Earth Mining Project of M/s Kisan Int Udyog — environmental approval granted, 4.2 km away
- Proposed Brick Earth Mining Project Located at Mauza… — environmental approval granted, 4.4 km away
- Proposed Sand Mining Project on Punpun River at Sand Block No.-38C (Aur Pun-… — under environmental review, 5.8 km away
- Proposed Sand Mining Project on Punpun River at Sand Block No.-38D (Aur Pun-… — under environmental review, 6.4 km away
- Brick Earth Mining for M/S HMT Int Udyog- Nagain Soil Brick Mining Project — environmental approval granted, 7 km away
- Proposed Brick Earth Mining for M/S DIL Int Udyog- Hathiyara Soil Brick Mining… — environmental approval granted, 10.2 km away
- Proposed Sand Mining Project of Area 86.85 Ha at Aurangabad Ghat 04 on Sone… — environmental approval granted, 10.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.