Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 13 Feb 2023 |
| Application filed | 13 Feb 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Paras Verma |
| Land area | 2.7 acres (1.1 ha) |
| Project cost | ₹25 lakh |
| Village / locality | Murhipar |
| Taluk / tehsil | Baloda Bazar |
| District | Baloda Bazar |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00079 |
In context
181 applications in Baloda Bazar since January 2022 are in the same category (Mining): 84 approved, 29 filed or under review, and 68 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 2.7 acres, this one is smaller than 90% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 21.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 14 mining leases have applied within 5 km.
Where it is
Murhipar, Baloda Bazar, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s. Verma Material Suppliers — more information requested, 0 m away
- Mudhipar Limestone Quarry (Rakesh Verma) — environmental approval granted, 200 m away
- Rakesh Verma Limestone Quarry Mudipar — cleared for impact study, 200 m away
- Expansion of Integrated Cement (Clinker: 8.1 MTPA to 16.1 MTPA, Cement: 6.5… — lapsed, 1.4 km away
- Expansion of Integrated Cement (Clinker: 8.1 MTPA to 16.1 MTPA, Cement: 6.5… — cleared for impact study, 1.4 km away
- Dindayal Agrawal limestone Quarry Mudipar — lapsed, 1.6 km away
- Mudhipar Limestone Quarry (Janak Ram Verma) — environmental approval granted, 1.6 km away
- Mudhipar Limestone Quarry — lapsed, 1.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.